Equipment

Explore ceramic tile processing equipment by material, finishing stage and factory interface. Start with a process overview or send the tile dimensions, required finish and existing line information for review.

Find a series by production task

Compare routes for tile and slab cutting, edge finishing, waterjet, handling, packaging and specialist production.

Explore the equipment series →

Need help selecting a machine?

Share your material, starting dimensions, the required finished part and the machines already on your line.

Discuss my equipment needs

Browse equipment

Tile Line Buffer & Accumulator

A tile-line buffer or accumulator temporarily holds product so a short downstream interruption does not immediately stop the upstream process. Its required capacity and mechanism come from the arrival rate, protected stop time, product condition,

View product

Tile Conveyor & Positioning Systems

A tile conveyor and positioning system moves a defined product between two machines and presents it to the next station at the required height, datum, orientation and spacing. It is a project-configured interface, not a

View product

Tile Transfer & Storage Systems

Move tile batches between process lines and hold planned work-in-process without treating every pause as the same buffer problem. BASAIR receives the line duty, layout and production constraints; the partner confirms the transfer mechanism, storage

View product

Tile Loading & Unloading Systems

A tile loading or unloading system must grip, lift, move and release the product without marking the surface or losing control of the load. The pickup method is selected from surface condition, porosity, format, weight,

View product

Tile Inlay & Mosaic Flattening Press

Input: Cut, washed and dried ceramic-tile or stone inlay pieces that have been arranged into the required pattern and coated with the selected adhesive on the back. Machine action: The patterned face is supported against

View product

Tile Back-grooving Machine

This page is for a wet, two-head machine that machines an L-shaped step on the back edge of tile, then smooths that step. It is not a general surface-slotting page: a photo of an ordinary

View product

Bilateral Offset Tile Edge & Chamfering Machine

Define the post-cut bilateral process Input Multiple tile strips leaving an upstream multi-blade cutter, with known parent-tile width and length, finished strip width, both target edges, strip spacing, pushing direction, front/back datum, and wet-processing conditions.

View product

Double-belt Tile Edge Grinding Machine

Compare the two belt-contact sections, support through the grinding heads and the handoff to the next station. Send the tile width, thickness and required edge to define the machine layout. Define the edge task before

View product

Tile Cutting & Chamfering Line

A tile cutting and chamfering line serves tile secondary-processing workshops that need cut parts to leave the same coordinated route with their specified straight/chamfered edge instead of moving batches between unrelated standalone machines. It must

View product

Automatic CNC Continuous Tile Cutter

Automatic positioning and continuous cutting—not automatic handling of the whole factory Input → action → output geometry → buyer → exclusion: flat ceramic tile or sintered-stone work with a defined feed direction, datum, spacing and

View product

Manual CNC Tile Cutting Machine

Grooving reference associated with the manual CNC tile cutter source. Groove dimensions, finish and acceptance require sample confirmation; this is not a photograph of the complete machine. Manual handling, CNC dimension setting Input → action

View product

Tile Surface Calibrating Machine

WET SURFACE CALIBRATION · PROJECT-CONFIGURED Control tile thickness and flatness before polishing A tile surface calibrating machine removes controlled high areas from a fired tile face so the next grinding or polishing stages receive a

View product

Small Cutting & Squaring Line

A small cutting and squaring line combines a compact cutting route with edge correction and material transfer for a workshop-scale product mix. It is not simply a shortened factory line. The correct configuration depends on

View product

Dust, Sludge & Water Treatment

Dust, Sludge & Water Treatment Start with the contaminant state, not an equipment name. Dry airborne dust needs a capture and air-handling route. Pumpable slurry needs solids concentration and dewatering decisions. Process water reuse needs

View product

Waterjet Systems

Waterjet systems cut tile, stone, sintered stone, glass and other approved materials by coordinating a motion platform with a high-pressure water circuit, abrasive delivery, cutting head, table, controls and utilities. The buying decision is a

View product

Stone, Sintered Stone & Countertop Equipment

Stone, sintered-stone and countertop equipment covers several distinct processing routes: slab cutting, thickness correction, surface polishing, profile work, small-piece or mosaic finishing, and fabricated countertop operations. The finished geometry and material decide the route; one

View product

Automation, Handling & Packaging

Tile automation, handling and packaging equipment moves, stores, turns, protects and packs ceramic tiles or slabs between process stations. A useful system is selected from the product’s surface, dimensions and weight together with the required

View product

Tile Secondary Processing Equipment

Tile secondary-processing equipment converts fired ceramic tile, porcelain tile or slab stock into a new size, edge, groove or assembled product. The correct machine route starts with the finished part drawing: cutting a strip, producing

View product

Ceramic Tile Squaring and Chamfering Machine Line

A ceramic tile squaring and chamfering line continuously corrects fired tile dimensions and edge geometry, then produces the specified small chamfer for downstream handling, inspection and packaging. BASAIR offers dry and wet configurations for ceramic and porcelain tile production, with the machine, diamond wheels, alignment, width adjustment and environmental interfaces selected as one system.

View product

Ceramic Tile Finishing Equipment

Ceramic tile finishing equipment covers the post-firing stations that control a tile’s final size, edge geometry, surface finish, cleanliness, dryness and protective treatment before sorting or packaging. BASAIR plans these stations around the incoming tile, the required finished product and the interfaces with the existing line—not as a fixed package of machines.

View product

Tell Us About Your Project

Your details are only used to respond to your enquiry.