Choose equipment by the job your line needs to do. For straight cuts and edge finishing, start with your material and finished size. For automation, start with the station where the product needs support, transfer or protection.
Cut and finish tile or slabs
Choose a route for ceramic tile, stone or sintered slabs, or use waterjet for cuts that need a different process.

Tile secondary processing
Cutting, sizing, edge finishing, grooves and special shapes for finished tile.

Stone and sintered-stone processing
Slab cutting, profiles and countertop fabrication, selected from the finished geometry.

Waterjet systems
Compare cutting platforms, high-pressure supply, abrasive handling and table interfaces.
Move and pack products
Compare between-station transfer and the equipment used to protect and pack finished products.

Handling and automation
Loading, transfer, conveying and buffering between processing and packing stations.

Tile packaging
Packaging routes for conventional tile, long narrow formats and large slabs.
Plan specialist production or match tooling
Compare material-specific production routes, or match compatible tooling and spares to installed equipment.

Foam ceramic processing
Material-specific cutting, engraving, bridge cutting and profile processing.

Technical ceramic production
Flat ceramic membrane manufacturing and ceramic plate cutting are distinct production routes.
Concrete curb equipment
Define forming, supported transport, curing and finished-product handling interfaces.

Tools and spares
Match cutting and finishing tools and replacement interfaces to the actual machine.
Choose individual machines or an integrated route
A separate station can suit changing products or a limited first investment. Connected stations reduce repeated handling only when their product envelope, rate, datum and control sequence agree. Compare the full route, including changeover, rejects, consumables, maintenance access and manual recovery, before choosing the automation level.
Information that makes a proposal useful
- Actual material, product drawings, size range, thickness, mass and representative samples.
- Incoming condition, required finished result and inspection criteria.
- Current process, desired production, product mix and changeover frequency.
- Factory layout, transfer heights, power, process utilities and access restrictions.
- Existing equipment and the exact machines, tooling, handling and installation work to include.
BASAIR confirms the configured equipment and interfaces in the project offer. Published examples do not establish a universal capacity, precision, finished-quality or safety-compliance promise.