Diamond Saw Blades for Ceramic Tile Cutting

BASAIR supplies diamond saw blades for ceramic tile, porcelain tile, mosaic cutting and strip cutting. The product range includes ultra-thin ceramic tile blades, wet cutting blades, continuous rim blades, turbo rim blades, laser-slotted blades and gang blades for multi-blade cutting machines.

For mosaic factories and tile processing lines, these blades can be mounted on a single spindle or dual-spindle multi-blade machine to cut large tiles into strips or mosaic-sized pieces in one pass.

Diamond Saw Blades for Ceramic Tiles

Diamond saw blades for ceramic and porcelain tiles are used when the cutting process requires clean edges, controlled chipping and stable cutting performance. The blade type needs to match the tile material, cutting method, machine structure and required edge result.

Typical Applications

  • Ceramic tile cutting
  • Porcelain tile cutting
  • Wet tile cutting
  • Strip cutting
  • Mosaic dicing
  • Multi-blade gang cutting
  • Small-piece ceramic tile processing

Key Features

  • Diamond cutting edge for hard ceramic and porcelain materials
  • Blade types for wet cutting, thin cutting and multi-blade cutting
  • Rim designs selected according to edge quality and cutting speed
  • Suitable for single-blade machines and multi-blade spindle setups
  • Used for straight cutting, strip cutting and mosaic production
Blade TypeTypical Use
S-Wave / Sinuous-Rim Diamond BladeCeramic tile cutting and grinding where cooling and chip removal are important
Turbo Wave / Turbo Rim Diamond BladeFaster cutting with better chip removal than a smooth rim
Continuous Rim Diamond BladeCleaner edge cutting for ceramic and porcelain tiles
Tortoise-Back / Mesh Rim Diamond BladeTile cutting and grinding with additional surface contact and heat control
Hot-Press Sintered Laser-Slotted Ultra-Thin Wet Diamond BladeThin wet cutting for ceramic and porcelain tiles

Gang Blades for Multi-Blade Cutting

When multiple diamond saw blades are mounted on the same arbor or spindle, the blade set is commonly described as a gang blade setup or multi-blade configuration. This is used for cutting one tile into multiple strips or mosaic pieces in a single pass.

TermMeaning
Gang blade / gang saw bladeA blade used as part of a multi-blade set mounted together for repeated parallel cuts
Multi-blade configurationSeveral blades installed on one shaft or machine for multiple cuts in one pass
Slitting bladeA blade used for ripping or cutting tiles into strips
Arbor-mounted bladeBlade mounted on an arbor for machine cutting
Spindle-mounted bladeBlade mounted on a spindle for automatic cutting machines

Typical Multi-Blade Applications

  • Ripping large-format tiles into strips
  • Mosaic dicing from 600 x 600 mm or 800 x 800 mm tiles
  • Single-pass multi-cut production
  • Gang cutting on mosaic tile cutting machines
  • Strip cutting before shaped mosaic processing

Wet Cutting and Ultra-Thin Blades

Many ceramic and porcelain tile saw blades are designed for wet cutting. Water helps cool the cutting area, reduce dust, remove slurry and improve blade life during high-speed cutting.

Ultra-thin wet blades are used when the factory needs a narrow kerf, reduced material loss and cleaner cutting edges. These blades are commonly selected for porcelain tile, ceramic tile and mosaic cutting applications.

Common Wet Blade Features

  • Hot-press sintered construction
  • Laser-slotted rim design
  • Ultra-thin segment options
  • Bore sizes such as 22.23 mm or 25.4 mm
  • Suitable for ceramic and porcelain tile cutting
Item No.Blade Diameter
(mm)
QtyCore Thickness
(mm)
Reinforcing Plate Diameter
(mm)
Segment Thickness
(mm)
Segment Height
(mm)
Bore Diameter
(mm)
SB-0112511.2–1.72522.23
SB-0212511.2–1.72522.23
SB-0312511.2–1.62522.23
SB-0412511.2–1.72522.23
SB-0511510.9601.28.022.23
SB-0612510.9701.28.022.23
SB-071151Machined thin core650.87.022.23
SB-081251Machined thin core800.87.022.23
SB-0911611.4–1.88.022.23
SB-1025011.6–2.08.025.4
SB-1130011.6–2.010.025.4
SB-1235011.8–2.210.025.4
SB-135520.4–0.68.06.0
SB-14452––0.6Full size6.0

Tell Us About Your Project

Your details are only used to respond to your enquiry.