Automatic positioning and continuous cutting—not automatic handling of the whole factory
Input → action → output geometry → buyer → exclusion: flat ceramic tile or sintered-stone work with a defined feed direction, datum, spacing and batch plan → the CNC positions the cutting dimension while the conveyor carries work through an ordered blade route → repeated straight-cut widths derived from feed direction, blade spacing and the confirmed station sequence → processors with stable batches that can justify continuous infeed, outfeed and line balancing → not the manual load/support/push responsibility of the manual CNC cutter, and not the downstream edge-grinding or chamfering responsibility of a cutting and chamfering line.
This is a partner-supplied equipment route. BASAIR can match the application and configure the commercial package, but the approved machine drawing, blade order, handling boundary, utilities and sample acceptance remain the controlling supply record. A conveyor-equipped cutter is not, by itself, proof of automatic slab loading, buffering or downstream finishing.

Select the operating route and station count together
| Route | Positioning and feed | Blade/station logic | Choose it when | Do not overlook |
|---|---|---|---|---|
| Manual CNC table route | CNC-set gauge; operator loads, supports and pushes each piece. | Flexible single-path work and special locating. | Sizes change often, batches are small or drawings vary. | Manual handling and feed consistency remain production constraints. |
| Semi-automatic conveyor cell | Operator or separate handler loads batches; conveyor controls passage through the cut. | Usually a limited station sequence configured for one recurring duty. | You need repeatable through-feed but do not yet have automatic loading or a balanced line. | This is an engineering route, not a specification asserted for the cited continuous-cutting reference. |
| Continuous automatic CNC cutter | CNC positions the dimension; conveyor, datum and pressure system control continuous passage. | Single or staged blades must follow the submitted cut sequence. The exact three-station reference uses three blade stations. | Input direction, spacing and batch sizes are stable enough to set a line takt. | Upstream loading, buffering, scrap removal, outfeed support and cleaning/drying are separate responsibilities. |
| Cutting plus chamfering line | Continuous handoff between cutting and edge-finishing stations. | Cutting sequence plus the required edge-grinding/chamfering route. | The saleable output requires a finished edge rather than a raw cut edge. | Edge orientation, transfer datum, chip control and line balancing must be designed together. |
Use Tile Secondary Processing Equipment to compare the complete machine family, or the Tile Secondary Processing Workshop to place cutting, handling, slurry control and inspection in one workshop plan.
Conditional market reference: three-station source configuration
The accurate partner page presents an three-station continuous CNC cutter for batch cutting of large ceramic tile or sintered-stone work. Its shown configuration combines CNC dimension positioning, a conveyor, a pressure/hold-down arrangement and three blade stations. The source illustrates a staged route that may be configured around pre-cut, bevel-related and full-cut duties; the actual blade type, order and depth must be confirmed against the submitted material and output drawing.
Model-specific market reference only: the exact page lists a 50–1800 mm working-width range, 6–20 mm working thickness, 2.5–7.5 m/min conveyor speed and three blade stations. These are conditional values for that cited machine, not a BASAIR-wide promise. They do not establish achievable line takt, finished-piece rate, cut tolerance, edge quality or suitability for a different material/configuration.
The final proposal must identify conveyor width, usable datum range, belt and support material, pressure arrangement, blade/arbor details, station order, changeover method, coolant circuit, guarding, control interface and the responsibility at both ends of the conveyor.
Define the flow from input spacing to inspected output
Infeed, datum and hold-down
Submit the feed direction and the edge used as the datum. State whether work arrives continuously or in batches, the minimum and maximum gap between pieces, and whether sizes are mixed. Flatness, warpage, face relief and existing edge damage affect belt contact, tracking and pressure. The conveyor can move the work; it cannot correct an unstable reference or an unsupported upstream handoff.

Blade order and production takt
Specify the number of cuts, finished widths, cut order, kerf allowance and whether stations have different duties. A three-station reference does not mean every job needs three active blades. Conversely, a wide size range does not establish that the machine can produce every requested width at the same speed. Takt must be calculated from material, cut length, station use, work spacing, changeover, handling and inspection—not copied from conveyor speed alone.
Outfeed, buffer and downstream work
Define whether cut pieces go to manual collection, a buffer, edge grinding/chamfering or another conveyor. Narrow or separated pieces need suitable support and spacing after the blade. If the required deliverable includes chamfered or finished edges, move to the E203 cutting and chamfering line rather than treating E202 as a finished-edge machine.

Utilities, slurry, cleaning and inspection are part of the line
- Electricity: confirm site voltage, frequency, phase, protection, isolation, earthing and the final motor/control schedule. Do not size the supply from a generic product label.
- Process water: the shown cutting arrangement uses water at the cutting stations. Confirm pressure, flow, nozzle positions, water quality, recirculation suitability and washdown boundary.
- Compressed air: the accurate source does not clearly identify a compressed-air requirement. Treat air as to be confirmed for the exact configuration, especially if the proposed pressure beam, valves, stops, clamps or upstream/downstream handling use pneumatic devices.
- Slurry: continuous wet cutting requires trays/drains, solids capture, accessible cleaning points and a defined settling or filtration route. Ceramic fines must not be allowed to accumulate around the belt, reference surfaces or rollers.
- Cleaning and drying: decide whether pieces are rinsed, brushed or simply drained after cutting. Dry the datum, edge and face enough for reliable inspection before packing or downstream finishing.
- Inspection: check width, parallelism, squareness, chipping, edge condition and face marking using the agreed method and sample frequency. Record which result is checked at the machine and which is checked after downstream work.
Submit this information for line configuration
| Submit | Required detail | Configuration decision it controls |
|---|---|---|
| Material and surface | Ceramic tile or sintered stone body, face finish/relief, photos, coating and handling sensitivity. | Belt/contact material, pressure, blade/coolant trial and face protection. |
| Input direction and spacing | Long or short edge leading, datum edge, minimum/maximum gap and orientation changes. | Conveyor, reference, sensing and station timing. |
| Continuous or batch flow | Batch size, sizes per batch, mixed-size rules and production window. | Recipe/changeover method and buffer requirement. |
| Flatness and datum condition | Warpage, thickness variation, existing edge variation and permitted face contact. | Hold-down, tracking, support and achievable inspection plan. |
| Finished size drawing | Original and finished dimensions, datum, kerf allowance, tolerance and edge-face requirement. | CNC positioning range and acceptance method. |
| Blade count and order | Cuts per piece, station sequence, blade duties, cut depth and tool preference. | Single/multi-station selection, motors, arbors, coolant and guarding. |
| Belt width and support | Largest/smallest work, finished-strip widths, support direction and surface-contact limits. | Usable conveyor geometry and narrow-piece outfeed support. |
| Changeover | Change frequency, recipe needs, blade/gauge adjustments and allowed stop time. | Controls, accessibility and production planning. |
| Target takt | Pieces/hour or pieces/shift by size, working hours, planned utilisation and inspection frequency. | Tests the whole line rather than equating conveyor speed with finished output. |
| Upstream, downstream and buffer | Loading method, prior process, available buffer, collection or next machine, and interface heights/directions. | Defines whether handling is manual, semi-automatic or line-linked. |
| Utilities and slurry | Electrical supply, water pressure/flow, drainage, recirculation, solids removal and available compressed air. | Completes the electrical/water/air scope and cleaning route. |
| Sample and inspection | Representative tiles, critical edge/face criteria, gauges and acceptance sample plan. | Replaces unsupported performance assumptions with a project-specific check. |
Compare blade sequence and usable working length
Continuous CNC cutting configurations include several sequential cutting positions and different working-length arrangements. Select them from a cut map: show the parent tile, each finished width, blade kerf, trim waste and the order in which parts leave the cutter. Three cutting positions do not automatically mean three simultaneous finished strips, and nominal working length does not establish the supported size of a large slab.
For long or fragile pieces, check conveyor support before, between and after the cutting positions. Specify how the leading and trailing ends are held, how speed is coordinated between stations and how cut pieces are removed without turning or mixing their faces. Compare usable batch output only after including feed spacing, waste removal, offloading, changeover and inspection. The selected blade route and utilities remain project-specific.