Tile Transport Belts
Match a tile transport belt by its dimensions, surface texture, joint and wet or dry operating conditions.
View detailsExplore project-configured routes for ceramic tile finishing, secondary processing, mosaic and strip production, stone profiles, sintered-stone slabs, countertops, waterjet cutting, factory automation, dust control, slurry treatment and machine-tool matching. Each route starts with the material, finished part, throughput, current equipment, site utilities and acceptance method so that the required modules and interfaces can be reviewed. These pages are selection guides, not fixed packages or unconditional performance commitments.
Find replacement parts for tile and stone processing equipment by part type or machine station.
Have your machine model, station and old part photo or dimensions ready.
Match a tile transport belt by its dimensions, surface texture, joint and wet or dry operating conditions.
View details →
Match a closed-loop belt by its tooth pitch, tooth count, width and installed position.
View details →
Detail photo
Check the tooth profile, installed length and fastening at both ends.
View details →
Identify belts by their function, tooth profile and joint before matching a replacement to the machine.
View details →
Assembly illustration
Decide whether you need the full drive set, one side or individual parts, then confirm the shaft and mounting interfaces.
View details →
Identify a motor or polishing head by its station, nameplate, drive interface and mounting dimensions.
View details →
Match the motor and spindle at a specific dry or wet squaring station using its nameplate, shaft and mounting dimensions.
View details →
Confirm the station, upper or lower orientation, shaft and wheel interface before replacing a chamfering motor.
View details →
Match the polishing head by its machine station, mounting geometry, drive and tool-holder interface.
View details →
Assembly illustration
Find plates, supports and adjustment assemblies by locating the installed part and measuring its mating surfaces.
View details →
Line-position illustration
Identify a tile pushing assembly by its line position, motion, stroke and the way it transfers the tile.
View details →
Assembly illustration
Record which side drives or follows the width change, then check the screw and each mounting interface.
View details →
Assembly illustration
Check how the existing block contacts the pressure beam and fits the track or guide before selecting a replacement.
View details →
Assembly illustration
Match the support plate by its installed position, hole pattern and mounting surfaces.
View details →
Identify saw spacers by their blade-stack dimensions and waterjet parts by the pump, pressure circuit and cutting head.
View details →
Confirm the pump and head before matching mixing tubes, jewels, nozzles or other high-pressure consumables.
View details →Start with the finish, cut or handling result you need. Use the solution cards to identify the stages and interfaces to review for your line.
Bring the target product, the current line layout and the step you need to improve.
Plan the stations needed to turn fired tiles into the required size, edge and surface finish.
View details →
Work from the finished piece to select cut-to-size, edge finishing, grooving or inlay stations.
View details →
Define each saleable width, edge finish and transfer step before choosing a strip or mosaic cutting route.
View details →
Use the installed countertop drawing to identify straight cuts, shaped edges, miters and openings.
View details →
Plan slab handling, cutting and edge preparation from the material and finished part drawing.
View details →
Match the cutting head, high-pressure supply and abrasive feed to the material and cut, then confirm the site interfaces.
View details →
Lay out splitting, calibration, shaping and polishing around the surfaces that each step needs to finish.
View details →
Transfer-station reference
Plan how tiles or slabs enter the line, receive protection and transfer as finished packs.
View details →
Process diagram
Specify the dust-producing stations and which run together before reviewing pickup, filtration and collection.
View details →
Process diagram
Map wastewater sources, solids and reuse needs to define the water treatment and slurry handling steps.
View details →
Identify the machine position and the component that needs replacing before checking fit and operating conditions.
View details →
Machine, tool and spare-part matching starts with the exact machine position. A brand or model family alone does not prove fit. BASAIR first separates the request into a process tool, consumable, motor/head, transmission part or

A slurry dewatering and process-water reuse route is a site water balance that connects wastewater sources, variable solids loading, conditioning, separation, cake handling, verified reuse-water duties and any permitted discharge. The buyer’s main decision is

Dry tile processing and dust control is a project-configured path that connects each dust-generating operation to source capture, ducts, optional pre-separation, final filtration, collected-dust handling and the site’s hazard review. It is not a collector

Tile automation and packaging is a project-configured sequence that receives a defined tile or slab, moves and buffers it under controlled conditions, applies any required surface protection, and releases an approved pack or logistics unit.

A waterjet cutting system is more than the gantry visible over the tank. The project boundary includes motion and head architecture, high-pressure generation and tubing, abrasive storage and metering, cooling, source water, software, electrical controls,

A countertop fabrication solution begins with the installed top, not with a single machine promise. The drawing must be separated into straight and irregular cuts, external edge profiles, 45-degree joints, sink or appliance openings, internal-edge

Sintered-stone slab processing is a project-configured route that turns approved slab inputs and finished-part drawings into supported cutting, edge preparation, handling and shipping steps. It is not one fixed line. The real buying decision is

Stone profile and small-piece processing is a sequence of unfinished surfaces, not one “profile machine.” A thick blank may first be split, calibrated and face-polished before profile shaping; the shaped face may then need a

A mosaic and strip production route is defined by the finished cut schedule: parent tile, cut directions, every saleable width, edge condition and the way small pieces remain supported through transfer and collection. The core

A tile secondary-processing workshop is configured from the finished part, not from a universal machine list. Straight sizing, a 45-degree decorative joint, a polished bullnose, a fixing groove and a bonded inlay all require different

A ceramic tile finishing line is the project route that turns a defined fired-tile input into an accepted size, edge and surface condition by coordinating only the necessary post-firing stations. The buyer’s decision is therefore
Your details are only used to respond to your enquiry.