Active & Passive Width-adjustment Bases

Width-adjustment bases must be identified by their actual role on the machine, not by the appearance of an isolated housing. For a paired arrangement, record each side separately: side reference, active or passive function, drive entry, screw or shaft interface, usable travel, mounting pattern, center height and limit arrangement.

The BASAIR source confirms a mechanical width-adjustment-base family. Its rendering does not establish which side is active or passive, whether the arrangement is left/right or paired, or what dimensions and travel apply to the customer’s machine. This page prepares evidence for review; it is not replacement approval.

Source-page exploded and assembled illustration of a mechanical width-adjustment base family
Source-page rendering of a mechanical width-adjustment-base family. Visible parts illustrate an adjustment mechanism only. The image does not identify active/passive role, left/right position, a paired supply set, travel, dimensions or compatibility.

Map both sides before naming either one active or passive

Take a full-machine photograph from the infeed end and another from the outfeed end. Mark tile travel, the machine centerline, the viewing direction used for left and right, and the two width-setting positions. Label the sides neutrally first—for example, “side shown in photo A” and “side shown in photo B”—then add active/passive labels only if supported by the machine manual, drawing or observed drive path.

For each side, state whether it receives the adjustment input, transmits motion to the other side, follows a shared shaft/screw, remains fixed, or performs another confirmed role. Show any cross-machine shaft, chain, gear, coupling or linkage. Do not assume that a visible handwheel alone proves the complete active/passive relationship.

Record each side independently before requesting a base
FieldSide ASide BEvidence source
Machine positionStation, side and marked photoStation, side and marked photoInstalled overview
Active/passive roleConfirmed role or “not yet confirmed”Confirmed role or “not yet confirmed”Manual, drawing or traced drive path
Drive entryHandwheel, motor, shaft or other confirmed inputHandwheel, motor, shaft or other confirmed inputFull path photos and movement video
Screw/shaft interfaceDiameter, exposed length, thread/lead if verified, key or couplingDiameter, exposed length, thread/lead if verified, key or couplingMeasured part or approved drawing
Travel and limitsStart, end, usable travel and limit methodStart, end, usable travel and limit methodSafe measurement and complete-cycle video

Measure mounting pattern, shaft center height and mating details

Measure the housing envelope, mounting-foot size, hole count and diameter, center distances from stated datums, slots, locating shoulders and the height of the screw or shaft centerline from the mounting face. Include required clearance for the handwheel, motor, cover or moving structure. Photograph the mounting face after removal and the mating machine surface before cleaning away location marks.

Record bearing and seal locations only as observed; do not infer their specification from the source illustration. If a gear, worm, screw, shaft, coupling or handwheel is part of the request, list it explicitly and provide its dimensions. State which components will be reused. A “complete base” must be defined by an itemized boundary, not by a family title.

Record usable travel, direction and limit arrangement

Mark the narrowest and widest safe machine positions and measure the travel of each side from the same datum. State whether both sides move together, move independently, or one remains fixed. Record the direction of rotation at the input and the resulting direction of base movement. If a position indicator, mechanical stop, proximity sensor or limit switch is present, photograph its mounting and target and provide its readable identification.

Send a short safe video showing the input, both sides and the full adjustment cycle. Report backlash, binding, unequal motion, abnormal noise, damaged threads or inability to reach a limit as observations. Do not assume that replacing the base alone will correct a drive, alignment or control problem.

Separate alignment and main-drive responsibilities

If the main function is to center or position a tile at a station, review tile alignment assemblies. If the request concerns the machine’s powered transmission rather than its width-setting base, use main drive kits. A width-adjustment quotation should not silently absorb those neighboring assemblies.

Use tile line mechanical parts when the family is still uncertain. For process context, see the ceramic tile squaring and chamfering line; for the complete evidence route, see machine, tool and spare-part matching.

Prepare a width-adjustment-base inquiry

  • Machine manufacturer, model, serial number and nameplate photographs
  • Exact station, tile-travel arrow, centerline and defined left/right viewing direction
  • Installed overview and separate labelled photos of both sides
  • Evidence-based active/passive role for each side, or a clear “not yet confirmed” status
  • Handwheel, powered input, cross-shaft, screw, gear and coupling path as applicable
  • Housing dimensions, mounting pattern, locating features and shaft/screw center height
  • Shaft diameter/length, keyway, thread, coupling and mating details as applicable
  • Start and end positions, measured usable travel, rotation/movement direction and limit arrangement
  • Complete assembly or individual-component boundary and items to be reused
  • Photos/video, observed fault, checks already completed, required quantity and opposite-side need
  • Destination country and requested timing

Send both-side width-adjustment evidence for review

Active/passive role, handedness, travel, material, dimensions, included components and compatibility cannot be confirmed from the source rendering. BASAIR confirms the replacement only after reviewing the actual machine and interface evidence.

Tell Us About Your Project

Your details are only used to respond to your enquiry.