Tile Pushing Assemblies

Tile pushing assemblies must be identified by the task they perform and the motion they complete at a specific line position. A useful inquiry records infeed/outfeed direction, start and end positions, stroke, cycle timing, drive and nameplates, mounting points, pusher head or rod, sensors/limits, tile contact and a complete action video.

The source image on this page is a line-position reference. It does not mean the surrounding frame, rollers, motor or other visible equipment are part of the pushing assembly. This page supports identification and quotation preparation; final geometry, force, speed, supply boundary and machine fit require actual machine evidence and BASAIR engineering confirmation.

Source-page line-position illustration associated with a tile pushing assembly
Source-page line-position reference associated with a tile pushing assembly. The complete frame, roller areas, motor and other visible components are contextual and are not a confirmed assembly supply list or engineering drawing.

Define what is pushed, from where and to where

Send a full-line photograph and mark the pushing station, tile travel direction and the next machine or process. State whether the assembly moves one tile, a row, a cut strip, a stack or another confirmed workpiece. Record the tile/material dimensions and condition at this point, including whether the item is supported on rollers, belts, guides or another surface.

Mark the assembly’s home/start position, first contact point, end position and release/return position on still images. Define left and right from a stated viewing direction and show the operator side, drive side and machine centerline. If the mechanism transfers across the main tile flow, draw both the line direction and push direction.

Evidence needed to describe the existing push cycle
Cycle elementWhat to recordWhy it changes the match
Task and workpieceWhat is pushed; tile/strip size and thickness; support surface; incoming and outgoing orientation.A pusher for one workpiece and direction may not suit another contact and support condition.
Start, contact and endHome position, first contact, end of useful push, overtravel if documented, release and return.“Stroke” without stated endpoints can describe different distances.
Cycle timingLine cycle time, push time, return time, dwell and trigger event measured from the existing machine.Timing determines integration; it is not a guaranteed value for a replacement until confirmed.
Drive and controlMotor/reducer, pneumatic or hydraulic actuator, chain/belt/screw/shaft path, nameplates, valves, sensors and limits.Mechanical fit alone does not confirm energy, connection or control compatibility.
Observed faultMissed push, short/long travel, skew, slip, impact, stall, slow return, sensor error, looseness or wear and when it occurs.The visible damaged part may be a consequence rather than the root cause.

Measure travel and capture a complete action video

Measure the usable push travel from a stable machine datum, not only actuator stroke. Record the position of the pusher head at home and at end of push, plus any linkage ratio or lost motion observed. If the assembly has multiple rods or push points, measure spacing, parallelism and whether they move together.

A safe video should show the incoming workpiece, trigger, full push, end condition, release, return and handoff to the next station. Include a second view showing the drive and sensors where possible. State the normal cycle time and the fault cycle time rather than estimating from memory. The video documents the existing behavior; it does not itself set a replacement performance guarantee.

Record mounting, pusher-head, drive and sensor interfaces

Measure the base or bracket mounting face, hole/slot pattern, center distances, locating features, center heights and required clearances. For the pusher head, claw, plate or rod, record overall dimensions, contact-face shape, connection to the moving element and replaceable wear surfaces. Do not infer material or contact force from color or appearance.

For an electric drive, provide motor and reducer nameplates, output orientation, shafts, keys, couplings and chain/belt/screw route. For pneumatic or hydraulic motion, provide cylinder/actuator markings, bore and stroke only if verified, rod and clevis dimensions, port sizes, valve identification and available pressure evidence. Include every readable electrical, pneumatic or hydraulic nameplate without converting it into an unsupported new specification.

Identify home, end and intermediate sensors or limit switches. Photograph each sensor, target/flag, bracket, connector and cable or tube direction. Record the observed state change during a cycle if it can be done safely. List guards and interlocks as existing interfaces; do not propose their removal or bypass.

Separate the pusher from alignment, width, drive and complete machine scope

A mechanism whose primary job is to center or square the tile belongs under tile alignment assemblies. A machine-width setting base belongs under width-adjustment bases. A line’s powered transmission set belongs under main drive kits. List any shared shafts, sensors or structures rather than silently combining those scopes.

A conveyor or positioning module is a larger equipment responsibility; see tile conveyor and positioning systems. For a pusher installed around multi-blade cutting, show the relevant multi-blade mosaic and strip cutter station. For post-cut offset edge processing, identify the bilateral offset tile edge machine context. The complete surrounding machine is not automatically included in a pusher quotation.

If the part family is still uncertain, use tile line mechanical parts. The broader machine, tool and spare-part matching route explains the evidence path.

Prepare a tile-pushing-assembly inquiry

  • Machine manufacturer, model, serial number, station and clear nameplate photos
  • Full-line overview with infeed/outfeed, push direction, centerline and next process marked
  • Workpiece type, dimensions, thickness, support surface and incoming/outgoing orientation
  • Home, contact, useful-push, end and return positions with measured travel
  • Normal cycle time, push/return/dwell timing and trigger event from the existing machine
  • Complete assembly or partial component boundary, with included and reused items listed
  • Mounting face, hole pattern, locating features, center heights and clearances
  • Pusher head/plate/claw/rod dimensions, contact face, spacing and connection details
  • Electric, pneumatic or hydraulic drive identity, nameplates, shafts/ports and transmission path
  • Sensor and limit identity, mounting, target/flag, connector and cable/tube direction
  • Complete safe action video, fault video if different, marked damage and checks already completed
  • Left/right or other direction reference, required quantity, destination country and requested timing

Send the push-cycle video, dimensions and interface evidence

The line-position rendering is not a product photograph, engineering drawing or supply list. BASAIR confirms assembly scope, geometry, drive, travel, timing and compatibility only after reviewing the customer’s actual machine and operating evidence.

Tell Us About Your Project

Your details are only used to respond to your enquiry.