5-axis Waterjet Cutting Systems

Configure a waterjet for bevels, miter joints and angled contours in ceramic tile, stone and sintered slab.

Review my cut

Start with your material, thickness and a drawing or target angle.

Compare AB and AC heads

AB waterjet head with paired tilt brackets around the nozzle above the cutting table

AB-style head

Two tilt axes

Compare the required tilt and nozzle pivot with the clearance around the slab edge and clamps.

AC waterjet head with an offset rotary and tilt assembly above the cutting table

AC-style head

Tilt axis + rotary axis

Check how the nozzle turns around the contour, including rotation limits and hose clearance.

An axis diagram and your part drawing are needed to confirm the usable angle and clearances for either configuration.

BASAIR gantry waterjet with a cutting table, control console and separate cabinet
Gantry waterjet system. The head, worktable and pump are selected for the project.

Start with the finished part

Square edge or taper compensation
Specify the acceptable difference between the top and bottom edges.
Bevel or mitered joint
Mark the finished face, reference edge and joint angle on the drawing.
Angled cutout or contour
Show corners, changes in angle and the areas that will be ground or assembled.

Assembled blue-grey slab basin and countertop with an angled internal joint
Application reference for assembled slab geometry. Joint and fit requirements are confirmed against the project drawing.

Check clearance at the cutting angle

Size the table for the largest part, then allow for loading, clamps, the tilting head and the nozzle-to-part gap along the full angled path.

LayoutWhat to requestWhat to check on the part
Every headHead photo, labeled axis drawing and a sample program.Nozzle gap, clamps, bridge and slat clearance throughout the cut.
ABTilting directions, travel limits and nozzle pivot.Can the head hold the target angle without hitting the part or fixture?
ACTilt and rotation limits, cable routing and permitted rotary motion.Can the nozzle maintain its orientation and gap around the contour?

Configure the full system

  • Select the table, pump and abrasive feed for the material and duty.
  • Check available power, water quality, cooling, drainage and spent abrasive handling.
  • Confirm controller, file formats, height sensing and nozzle consumables.

See the pump and abrasive system and waterjet wear parts.

See the waterjet systems overview and system planning guide for the equipment and site interfaces.

Check a representative cut

Use your material and drawing to assess a sample. Agree the angle, corner shape, surface condition and final joint fit before evaluating the proposed configuration.

The achievable angle, capacity and finish depend on the material, head, pressure system, control and test conditions.

Have a part in mind?

Tell us what you are cutting and which angle or contour you need.

Review my cut

Tell Us About Your Project

Your details are only used to respond to your enquiry.