A waterjet is not complete when the cutting table arrives. The working system must connect conditioned supply water, the selected high-pressure pump or intensifier, protected high-pressure plumbing, the cutting valve and head, abrasive storage and metering, pump cooling, electrical/control equipment, the catcher tank, drainage and a maintainable safety boundary.
BASAIR coordinates these interfaces as one project package. The selected manufacturing partner confirms the final pump and auxiliary configuration against the buyer’s material, toolpath, duty, utilities and site. Fixed pressure, flow, power, abrasive consumption, cut speed or maintenance life are not carried from a single reference model into another project.

Follow the complete flow and responsibility boundary
| System node | Function and interface to confirm | Buyer / site responsibility | Machine-package responsibility |
|---|---|---|---|
| 1. Supply water and conditioning | Stable inlet pressure/flow, temperature, filtration and pump-specific water-quality limits; boost or treatment only where required | Provide analysis and connection; maintain approved supply and treatment consumables | State accepted range, connection, filters and any specified boost/treatment equipment |
| 2. Pump / intensifier | Convert conditioned water into the high-pressure flow required by the selected orifice(s), head count, material and duty cycle | Provide electrical service, cooling connection, service clearances and trained maintenance | Select pump duty, motor/control, pressure-relief/bleed-down arrangement and maintenance schedule |
| 3. High-pressure line and cutting valve | Route pressure-rated tubing and fittings to the head while protecting people, motion and service access | Keep the route and restricted area clear; do not modify pressure components without approval | Provide rated components, supports, isolation, relief/bleed-down instructions and leak-inspection points |
| 4. Orifice, mixing chamber and nozzle | Create a high-velocity water stream; for abrasive cutting, introduce and accelerate the specified abrasive downstream of the orifice | Supply approved consumables and record wear, alignment and cut-quality changes | Match orifice/nozzle/mixing components to pump flow, head count and material trial |
| 5. Abrasive storage, air and metering | Keep garnet abrasive sand dry, deliver it to the head and meter it for the approved process; compressed air may be required by the selected feed system | Provide clean/dry abrasive and specified air, safe refill access and inventory control | Define pot capacity, air range, transfer/metering hardware, interlocks and refill procedure |
| 6. Cooling loop | Remove heat from the pump/hydraulic circuit through the selected water- or air-cooled arrangement | Provide ambient/site data, approved cooling water or ventilation and heat-rejection location | Size heat exchanger/chiller/tower duty and specify flow, temperature and water-quality limits |
| 7. CNC, electrical and safety control | Coordinate toolpath, pump ready state, abrasive, motion, faults, guards and emergency stops | Provide voltage/frequency/phases, earthing, local disconnect and approved network/data policy | Provide final load list, schematics, breakers/isolators, interlocks, alarms, software and backups |
| 8. Catcher, drain and solids | Receive the spent jet, water, garnet and removed material; separate clean cooling duties from contaminated process discharge | Provide approved drain/reuse route, settling/sludge handling and clean-out access | Define tank overflow/clean-out and pump waste-water points; state what treatment equipment is included or excluded |


Lock the Q3 inputs before sizing the package
| Q3 and site input | Minimum evidence | System decision it controls |
|---|---|---|
| Material | Material/grade, thickness range, surface condition, part mix and representative samples | Water-only or abrasive route, pierce method, process trial, consumables and solids handling |
| Drawing / toolpath | CAD and marked PDF, contour length, pierces, nests, head count and simultaneous-path proposal | Duty cycle, pump flow, abrasive demand, controller/post-processor and trial plan |
| Working size | Maximum sheet/part, weight, loading direction, table/catcher size and usable travel | Machine layout, foundation load, water volume, clean-out route and service clearances |
| Precision and edge / surface | Tolerance by feature, cut-face/taper target, surface-protection rule and inspection method | Quality-speed trade-off, orifice/nozzle, abrasive rate and acceptance trial |
| Pump | Preferred/installed pump, head count, orifice, shifts, uptime target, maintenance skill and spares policy | Pump type/duty, redundancy, cooling, service access and maintenance scope |
| Software | CAD/CAM, file types, nesting, post-processor, controller language, network limits and backup method | Controller and programming responsibility, recipe security, training and data hand-off |
| Auxiliary systems and site | Incoming-water analysis; abrasive and compressed air; cooling; drainage/reuse; power; ambient conditions; floor, anchors, lifting and restricted area | Complete utility list, layout, inclusions/exclusions, installation boundary and safe operating envelope |


Installation and safety acceptance
- Foundation, bearing and anchoring: the final general-arrangement and load drawings must state machine, full catcher-water, workpiece and auxiliary loads. The buyer verifies floor capacity, levelness, pit or drain details, anchors, lifting route and service clearances before delivery.
- Electrical: the final load list covers the pump motor, CNC/drives, cooling, abrasive system, water treatment/boost equipment, extraction or sludge equipment and service outlets. Provide compliant earthing, protection, local disconnects and lockout points.
- Maintenance: agree inspection and replacement access for filters, seals, check valves, high-pressure cylinders/tubing/fittings, orifice, mixing chamber, nozzle, abrasive metering, heat exchanger and catcher. Record leaks and cut-quality changes; never inspect a suspected high-pressure leak by hand.
- High-pressure isolation and depressurization: before any maintenance, lock out electrical, hydraulic, pneumatic and water energy as applicable; isolate high-pressure supply; operate the specified bleed-down sequence; verify zero pressure; then secure moving parts. An emergency stop is not a lockout device.
- Emergency stops and guards: test emergency-stop stations, guard/interlock response, pump stop/bleed-down behavior and restart controls during commissioning. Protect people from the jet, high-pressure leaks, bridge/head motion, abrasive splash, wet floors, electrical hazards and suspended loads.
- Site safety boundary: keep a restricted-access zone larger than the complete moving envelope, use trained authorized personnel and site-specific protective equipment, and display the emergency response for high-pressure injection. Any suspected injection injury requires immediate emergency medical treatment even if the wound appears small.
- Drainage and environmental boundary: confirm where pump waste-water, tank overflow and clean-out slurry go; separate solids before reuse/discharge; and document the party responsible for local permits, water reuse criteria and waste disposal.