This page covers two different procurement routes. A shared-bridge dual-head waterjet is selected to run one three-axis vertical head and one five-axis head on the same machine, individually or together on matched trajectories when spacing and part geometry allow. A visual sink-processing waterjet is a separate specialist route built around camera imaging, probing or height sensing, basin positioning and generated or corrected cutting paths. Neither route should be specified from the words “dual head” or “sink machine” alone.
BASAIR collects the buyer’s part, drawing, takt and site information and coordinates the project interface. The selected manufacturing partner confirms the exact head combination, bridge/table arrangement, vision package, pump duty, controller, software and safety package.

Choose the route from the production task
| Decision point | Shared-bridge dual-head route | Visual sink specialist route |
|---|---|---|
| Primary job | Use either head for its own task, or cut two compatible parts/paths together when the source configuration supports common motion | Locate a physical basin or basin/slab relationship, capture geometry, create or align the cut path, then cut the sink-related profile |
| Head arrangement | One three-axis vertical head plus one five-axis head on a shared bridge in the referenced route; final combination is configuration-specific | Five-axis cutting head combined with camera/vision, probe or height-sensing elements and a basin-positioning fixture |
| When two parts can run together | Only when toolpaths, head spacing, material/thickness, pierce sequence, quality target and table layout are compatible; “dual head” does not prove independent simultaneous paths | Not the deciding question: the value is repeatable visual/probe registration for a defined sink process, not simply adding a second cutting head |
| Data that drives the table | Maximum sheet/part, paired-part spacing, shared nesting, loading direction and clearance between both heads | Basin envelope and rim, cut-out profile, slab envelope, fixture location, scan field, probe access and reject handling |
| Acceptance trial | Run the buyer’s single-head jobs and a representative paired job; record both-part geometry and cycle time | Use the buyer’s basin family and slab, test image/probe registration, toolpath approval, cut-out fit and edge condition |

For a visual sink machine, define the physical reference
The specialist route must state whether the camera reads the basin, the slab, printed/physical marks or a fixture reference; what the probe or height sensor measures; and who approves the generated CAD/toolpath before high-pressure cutting begins. Basin families with different rims, corner radii, slopes or mounting positions need separate representative trials. A rendering or nominal basin size does not replace a physical sample or controlled dimensional data.


Send one complete Q3 data set for the selected route
| Q3 input | Shared-bridge dual-head evidence | Visual sink specialist evidence |
|---|---|---|
| Material | Material/grade, thickness range, paired sheets or part blanks, surface protection and fragile zones | Slab material/thickness plus basin material, rim condition, sample variation and fixture contact limits |
| Drawing / toolpath | Both head paths, common datum, head offset/spacing, pierce order, nesting and situations requiring single-head mode | Dimensioned basin/cut-out drawings, scan or probe method, path-generation rule, offsets and program-approval responsibility |
| Working size | Maximum sheet and part, usable shared area, distance between repeated features, sheet weight and loading direction | Slab and basin envelopes, fixture/scan field, head reach, Z clearance, loading and finished-part removal |
| Precision and edge / surface | Tolerance and edge target for each head, permitted difference between paired parts, bevel/perpendicularity and inspection method | Cut-out-to-basin fit, reveal/overhang, corner and edge finish, surface protection and physical fit-check method |
| Pump | Single or multi-pump proposal, simultaneous-head duty, orifice/nozzle pairing, duty hours and maintenance plan | Pump duty for the selected sink head, material/thickness, shifts, pierce method and service access |
| Software | CAD/CAM, import formats, two-head nesting/offset logic, controller, operator language and backups | Camera/vision and probe software, accepted order files, image-to-CAD workflow, approval screen, recipe control and backups |
| Auxiliary systems | Abrasive feed for both heads, water treatment, cooling, catcher clean-out, drainage, guarding and head-interference controls | Basin fixture, camera lighting, probe/laser, abrasive feed, water treatment, cooling, drainage, guarding and reject/rework method |

Utilities, installation and high-pressure safety
- High-pressure water: confirm incoming water pressure, flow, temperature, filtration and water quality for the selected pump, then define high-pressure tubing routes, protected fittings and cutting-head connections.
- Abrasive: state garnet specification, storage, metering, refill method and whether one or both heads consume abrasive simultaneously; define wet abrasive and swarf removal.
- Cooling: size the pump cooling loop for simultaneous duty, local ambient conditions and the selected heat-rejection method.
- Drainage: provide controlled catcher-tank overflow, pump waste-water and clean-out drainage with settling/sludge handling; confirm local reuse or discharge limits.
- Electrical power: provide voltage, frequency, phases, available load and earthing. The final pump motor, drives, vision equipment, lighting, computer, chiller/cooling and auxiliaries determine cables, breakers and disconnects.
- Foundation, bearing and anchoring: check the combined machine, water, workpiece and auxiliary loads; use the supplier’s final foundation and anchor plan, level the table and reserve service/lifting access.
- Maintenance: leave safe access to both heads, high-pressure fittings, filters, pump seals/check valves, abrasive equipment, cameras/probes and catcher clean-out. Agree calibration checks and critical spares.
- Isolation and depressurization: before clearing a head or opening any pressure connection, lock out all energy, isolate the high-pressure source and verify zero pressure through the specified bleed-down procedure. Emergency stops do not replace energy isolation.
- Emergency stops, guards and site boundary: locate emergency stops for loading and operating positions, protect the full bridge/head motion envelope, manage splash/noise and keep unauthorized personnel outside the restricted zone. High-pressure injection injuries require immediate emergency medical treatment.