Configure a waterjet for bevels, miter joints and angled contours in ceramic tile, stone and sintered slab.
Start with your material, thickness and a drawing or target angle.
Compare AB and AC heads

AB-style head
Two tilt axes
Compare the required tilt and nozzle pivot with the clearance around the slab edge and clamps.

AC-style head
Tilt axis + rotary axis
Check how the nozzle turns around the contour, including rotation limits and hose clearance.
An axis diagram and your part drawing are needed to confirm the usable angle and clearances for either configuration.

Start with the finished part
- Square edge or taper compensation
- Specify the acceptable difference between the top and bottom edges.
- Bevel or mitered joint
- Mark the finished face, reference edge and joint angle on the drawing.
- Angled cutout or contour
- Show corners, changes in angle and the areas that will be ground or assembled.
For vertical cuts only, compare a three-axis waterjet. For basin work with two cutting heads, see dual-head and sink waterjet systems.

Check clearance at the cutting angle
Size the table for the largest part, then allow for loading, clamps, the tilting head and the nozzle-to-part gap along the full angled path.
| Layout | O que solicitar | What to check on the part |
|---|---|---|
| Every head | Head photo, labeled axis drawing and a sample program. | Nozzle gap, clamps, bridge and slat clearance throughout the cut. |
| AB | Tilting directions, travel limits and nozzle pivot. | Can the head hold the target angle without hitting the part or fixture? |
| AC | Tilt and rotation limits, cable routing and permitted rotary motion. | Can the nozzle maintain its orientation and gap around the contour? |
Configure the full system
- Select the table, pump and abrasive feed for the material and duty.
- Check available power, water quality, cooling, drainage and spent abrasive handling.
- Confirm controller, file formats, height sensing and nozzle consumables.
See the pump and abrasive system e waterjet wear parts.
See the waterjet systems overview e system planning guide for the equipment and site interfaces.
Check a representative cut
Use your material and drawing to assess a sample. Agree the angle, corner shape, surface condition and final joint fit before evaluating the proposed configuration.
The achievable angle, capacity and finish depend on the material, head, pressure system, control and test conditions.
Tem uma peça em mente?
Diga-nos o que você está cortando e qual ângulo ou contorno você precisa.