Abrasives & Tools

Select abrasives and diamond tools by machine position, dry or wet working condition, material and mounting interface. Send current tool photos and measured dimensions for a replacement review.

Processing Tools and Machine Spares

Match cutting blades, polishing tools, chamfering wheels, heads and belts to the actual material, machine interface and finished result, using part dimensions, operating conditions and current failure evidence.

View product

Pre-cut, Chamfering & Full-cut Discs

Pre-cut, edge-correction or chamfering, half-cut and full-cut positions are different jobs. A three-position machine does not automatically use one standard sequence or one interchangeable disc family. BASAIR first identifies the host machine and the duty

View product

Magnesite Abrasives for Stone

Configure magnesite Fickert abrasives around the stone, machine position and wet process Magnesite-bond Fickert abrasives are selected as part of a stone grinding process, not by grit number alone. The useful starting point is the

View product

Metal & Resin Bond Fickert Abrasives

Select a diamond Fickert by the polishing head, holder length and its position in the grinding sequence—not by block colour or a generic grit chart. BASAIR can configure metal- and resin-bond Fickert abrasives for rough

View product

Cutting & Grooving Tools

Cutting and grooving tools include saw blades for separating material, grooving discs for forming a specified slot, wheels that grind or polish the slot after cutting, and chamfer-cutting discs used in a defined multi-stage edge

View product

Surface Finishing Tools & Consumables

Surface-finishing tools and consumables develop texture, appearance or a confirmed end treatment after the surface has been adequately prepared. Elastic lappato abrasives, Fickert brushes, polishing/buffing pads and wax or nano-treatment consumables belong to different stages

View product

Calibrating & Grinding Tools

Calibrating and grinding tools prepare tile or stone surfaces by correcting thickness, flatness or roughness before later finishing stages. Calibrating rollers, cylindrical or satellite wheels, and Fickert-form abrasives use different machine motions and mounting interfaces;

View product

Squaring & Chamfering Tools

Squaring and chamfering tools are selected by the machine station and the edge result it must produce. Disc squaring wheels remove controlled material to establish tile dimensions; chamfering wheels create a small or decorative bevel;

View product

Diamond Squaring Wheels for Ceramic Tile Edge Finishing

Diamond squaring wheels are production-line tools used to remove controlled material from ceramic or porcelain tile side edges during dimensional rectification. The correct wheel is selected for a specific machine position by working condition, bond, base, rim structure, grit, removal task and mounting interface—not by diameter or appearance alone.

View product

Tell Us About Your Project

Your details are only used to respond to your enquiry.