Width-adjustment bases must be identified by their actual role on the machine, not by the appearance of an isolated housing. For a paired arrangement, record each side separately: side reference, active or passive function, drive entry, screw or shaft interface, usable travel, mounting pattern, center height and limit arrangement.
The BASAIR source confirms a mechanical width-adjustment-base family. Its rendering does not establish which side is active or passive, whether the arrangement is left/right or paired, or what dimensions and travel apply to the customer’s machine. This page prepares evidence for review; it is not replacement approval.

Map both sides before naming either one active or passive
Take a full-machine photograph from the infeed end and another from the outfeed end. Mark tile travel, the machine centerline, the viewing direction used for left and right, and the two width-setting positions. Label the sides neutrally first—for example, “side shown in photo A” and “side shown in photo B”—then add active/passive labels only if supported by the machine manual, drawing or observed drive path.
For each side, state whether it receives the adjustment input, transmits motion to the other side, follows a shared shaft/screw, remains fixed, or performs another confirmed role. Show any cross-machine shaft, chain, gear, coupling or linkage. Do not assume that a visible handwheel alone proves the complete active/passive relationship.
| Field | Side A | Side B | Evidence source |
|---|---|---|---|
| Posição da máquina | Station, side and marked photo | Station, side and marked photo | Installed overview |
| Active/passive role | Confirmed role or “not yet confirmed” | Confirmed role or “not yet confirmed” | Manual, drawing or traced drive path |
| Drive entry | Handwheel, motor, shaft or other confirmed input | Handwheel, motor, shaft or other confirmed input | Full path photos and movement video |
| Screw/shaft interface | Diameter, exposed length, thread/lead if verified, key or coupling | Diameter, exposed length, thread/lead if verified, key or coupling | Measured part or approved drawing |
| Travel and limits | Start, end, usable travel and limit method | Start, end, usable travel and limit method | Safe measurement and complete-cycle video |
Measure mounting pattern, shaft center height and mating details
Measure the housing envelope, mounting-foot size, hole count and diameter, center distances from stated datums, slots, locating shoulders and the height of the screw or shaft centerline from the mounting face. Include required clearance for the handwheel, motor, cover or moving structure. Photograph the mounting face after removal and the mating machine surface before cleaning away location marks.
Record bearing and seal locations only as observed; do not infer their specification from the source illustration. If a gear, worm, screw, shaft, coupling or handwheel is part of the request, list it explicitly and provide its dimensions. State which components will be reused. A “complete base” must be defined by an itemized boundary, not by a family title.
Record usable travel, direction and limit arrangement
Mark the narrowest and widest safe machine positions and measure the travel of each side from the same datum. State whether both sides move together, move independently, or one remains fixed. Record the direction of rotation at the input and the resulting direction of base movement. If a position indicator, mechanical stop, proximity sensor or limit switch is present, photograph its mounting and target and provide its readable identification.
Send a short safe video showing the input, both sides and the full adjustment cycle. Report backlash, binding, unequal motion, abnormal noise, damaged threads or inability to reach a limit as observations. Do not assume that replacing the base alone will correct a drive, alignment or control problem.
Separate alignment and main-drive responsibilities
If the main function is to center or position a tile at a station, review tile alignment assemblies. If the request concerns the machine’s powered transmission rather than its width-setting base, use main drive kits. A width-adjustment quotation should not silently absorb those neighboring assemblies.
Utilização tile line mechanical parts when the family is still uncertain. For process context, see the ceramic tile squaring and chamfering line; for the complete evidence route, see machine, tool and spare-part matching.
Prepare a width-adjustment-base inquiry
- Machine manufacturer, model, serial number and nameplate photographs
- Exact station, tile-travel arrow, centerline and defined left/right viewing direction
- Visão geral da instalação e fotos separadas e identificadas de ambos os lados
- Função ativa/passiva comprovada para cada lado, ou um status claro de “ainda não confirmado”
- Volante, entrada motorizada, eixo transversal, parafuso, engrenagem e trajetória do acoplamento, conforme aplicável
- Dimensões da carcaça, padrão de montagem, recursos de posicionamento e altura do centro do eixo/parafuso
- Diâmetro/comprimento do eixo, ranhura para chaveta, rosca, acoplamento e detalhes de encaixe, conforme aplicável
- Posições inicial e final, curso útil medido, direção de rotação/movimento e disposição dos limites
- Limites da montagem completa ou de componentes individuais e itens a serem reutilizados
- Fotos/vídeo, falha observada, verificações já realizadas, quantidade necessária e necessidade do lado oposto
- País de destino e prazo solicitado
Envie evidências do ajuste de largura de ambos os lados para análise
O papel ativo/passivo, a lateralidade, o curso, o material, as dimensões, os componentes incluídos e a compatibilidade não podem ser confirmados a partir da renderização de origem. A BASAIR confirma a substituição somente após analisar a máquina real e as evidências da interface.