Build repeatable tile stacks for the next handling or packaging operation. A belt-type stacking arrangement brings individual tiles into a defined stack; it is not the same task as long-term batch storage or lifting a completed stack.

Belt-supported stacking
The transfer datum, arrival gap and stack discharge must work together. Thin pieces need continuous support; uneven edges or surface texture can change how tiles settle. A faster infeed is useful only if stack formation and discharge keep pace.
Define the machine and line boundary
BASAIR reviews the product and factory requirements with you, then confirms the configured equipment, tooling, handling, control connections and installation responsibilities in the project offer. State which upstream and downstream machines already exist and which must be included. A reference arrangement is not a fixed catalog specification.
- Confirm the incoming product condition, location reference and permitted contact surfaces.
- Define the finished output, inspection point, reject route and next operation.
- Provide the factory layout, transfer heights, access, electrical supply and any process utilities.
- Agree on ready, busy, blocked and fault signals and responsibility for restart and manual recovery.
Prepare a representative trial
Use the actual material and the most demanding agreed format. Record finished quality, damaged or rejected pieces, cycle conditions, changeover and recovery. Any capacity, dimensional tolerance or acceptance value belongs to the confirmed configuration and agreed test conditions.
Information for a configuration review
Send tile formats, thickness and unit mass; tiles per stack; face orientation; separators; permitted edge contact; stack-height tolerance. Include photos of the current process and mark the desired supply boundary on the layout. These inputs allow the proposal to address the real workpiece and factory interface.
Related review: tile transfer and storage systems.
Send your product samples and layout for configuration review