A stone surface polishing line is the finishing stage after the slab has been made sufficiently flat and consistent in thickness. Its job is to carry the face through a controlled abrasive progression under repeatable pressure, feed and water conditions. This page keeps BASAIR-owned-source line references separate from the partner YSU stone family; no compatibility, certification or 72-hour test claim is inherited from another page.

Define the surface-finishing task
- Input
- Calibrated stone, engineered-stone or quartz slabs with a known width, thickness, initial scratch/flatness condition, face orientation and target surface description.
- Action
- Restrain and convey the slab through a confirmed number of polishing heads, applying a material-specific abrasive progression, pressure, oscillation or head motion, feed speed and water delivery.
- Output
- A continuously processed slab face ready for inspection and the next edge, countertop or packaging operation. The accepted result is defined by an agreed sample and measurement method, not by an unsupported universal gloss promise.
- Buyer
- Stone and quartz processors with repeat face-finishing demand, stable upstream calibration and enough batch continuity to justify an automatic multi-head line.
- Exclusion
- This is not the main machine for heavy thickness correction, narrow small-piece polishing, edge/profile work or mosaic-only handling. Upstream thickness/flatness correction belongs to the stone and quartz calibrating machine.
Browse the larger equipment route at stone, sintered-stone and countertop equipment. For profile and small-piece routes, see stone profile and small-piece processing.
Three references, three different evidence roles
| Reference family | What is supported | Selection use | Explicit non-transfer |
|---|---|---|---|
| BASAIR-owned source: 6–10 heads line | A configurable multi-head polishing-line concept for surface treatment; the source mentions tile, granite, marble and stone slabs and says head count, processing width and length can be configured. | Direct BASAIR line architecture reference; exact stone build must be re-confirmed. | No universal material fit, compatibility, certification, service or 72-hour test promise is carried into this page. |
| BASAIR-owned source: ceramic BSP line | An adjacent ceramic-line reference showing multi-head frame, belt, polishing-head and control architecture; its page lists BSP width/head variants. | Useful for discussing line modules and maintenance access only. | BSP600/800/1000, 6–20 heads, ceramic feed and ceramic thickness values are not declared as a stone offer. |
| Partner source: YSU-1200 stone family | A 16-head stone-face polishing model and a family described with selectable widths of 400/600/800/1000/1200 mm and 8/10/12/14/16/20 heads. | Concrete B-class partner reference for stone, quartz, engineered stone and related face-polishing inquiries. | The partner’s certification wording, experience, customer claims and promotional effect claims are not BASAIR facts. |
YSU-1200 model-bound values
The exact partner page lists the shown YSU-1200 with a 1220 mm belt, 16 polishing heads of 150 mm diameter, a listed 0.5–2.5 m/min polishing speed, maximum 50 mm thickness, maximum 1200 mm width, 40 L/min air and 350 L/min water. These figures apply only to that displayed model/source configuration and must be confirmed against the submitted material, desired surface, abrasive system and destination-site supply. The page’s individual motor-power rows do not arithmetically reconcile with its stated total power, so no motor or total-power combination is published here; final connected load and motor schedule must come from the partner-confirmed electrical list for the offered build.
For a stone polishing installation, compare the workpiece support, the sequence of heads and abrasives, and the utilities available at each station.
Define the incoming slab face and an agreed finish sample before selecting the polishing sequence. Record material, size, initial marks and the acceptance method. A slab at an infeed does not establish its material, incoming finish or finished quality.
The abrasive sequence starts with the incoming face
Describe the incoming surface with photographs and measurements: calibration marks, saw marks, resin fill, waviness, existing grit stage and any sections that must not be exposed. The first polishing head should remove the previous process marks without consuming the stock reserved for later stages. A line with more heads does not automatically deliver a better surface if the initial condition, abrasive jumps or pressure settings are wrong.
For each stage, confirm abrasive format, bond, grit, mounting interface, head rotation/motion and water requirement. The suitable tool path can include magnesite stone abrasives, but machine position and material must be checked; a tool name alone is not a compatibility guarantee.

Flatness, pressure and slab restraint
Feed only workpieces that the polishing line can support consistently. Record width, thickness, length, bow, edge condition and the smallest slab. Define the datum face and whether a fragile surface film or texture restricts pressure devices. Upstream calibration should remove large thickness differences; forcing a polishing head to follow a severely uneven slab risks non-uniform contact and inconsistent finish.
On the partner YSU reference, polishing pressure is described as pneumatic. If that route is selected, provide air pressure, flow and quality for simultaneous head operation. Air demand is not assumed for the separate BASAIR-owned-source build until its exact head/pressure system is confirmed.
Water, power, sludge and layout
- Water: size pressure and flow for all active heads, use filtration appropriate to the abrasive/material, and prevent solids from recirculating at a level that scratches the face.
- Slurry: capture fines and spent abrasive, provide settling or dewatering, and define who supplies tanks, pumps, channels and clean-out access.
- Electricity: give voltage, frequency, phase, earthing and available connected load. Motor/total-power values remain model-specific.
- Air: provide only where the selected pressure system needs it; confirm compressor, receiver, dryer/filtration and simultaneous demand.
- Infeed/outfeed: match transfer height, direction, slab support and buffer. Wet polished slabs may require drip control, inspection lighting and drying before packaging.
- Floor: provide level support, drainage, foundation/anchor decision, full head-lifting and abrasive-change clearance, electrical-panel access and a safe handling aisle.
- Safety: address rotating-head enclosure, nip points, emergency stops, interlocks where required, electrical isolation, lockout, safe abrasive change and chemical exposure from any polishing additives. Destination-site rules determine the final package.
Choose abrasive sequence, pressure and cooling from the condition of the incoming face and the required finish sample.
Set a measurable acceptance method
Agree on representative material and a reference sample before fixing the configuration. The acceptance plan can include thickness after calibration, flatness, visual uniformity under defined lighting, gloss readings where appropriate, scratch/line inspection, edge protection and throughput under stated input conditions. A target value without a measurement instrument, sampling position and starting condition is not a usable guarantee.
Information to submit
| Submit | Minimum detail | Configuration decision |
|---|---|---|
| Material and slab range | Material, width, length, thickness, weight, face orientation and representative samples | Family, belt, support and head-pressure route |
| Incoming face | Previous calibrating/tool stage, scratches, flatness, resin fill and photographs | Starting grit and removal progression |
| Target surface | Approved sample, visual/gloss method, allowed defects and next process | Head count, abrasive sequence and acceptance plan |
| Production | Slabs/shift, batches, size/material changes and planned shifts | Line speed, buffer and changeover review |
| Line interfaces | Upstream calibrator, downstream inspection/drying/edge/packaging, heights and directions | Transfer and layout scope |
| Utilities/environment | Power, water, air, filtration, slurry/dewatering, floor plan, safety rules | Complete supply boundary and site readiness |