Calibrating removes controlled stock to bring a stone or quartz workpiece toward a consistent thickness and flatter face before final polishing. This page keeps two partner machines separate: a wider two-head YSG family and a narrow-strip YCGU-150 1+2 route. Their head types, work envelopes and process roles must not be merged into one specification.

Define the operation
- Input
- Stone, engineered stone, quartz or a proposed ceramic board with known width, length, actual thickness map, high spots, surface condition and downstream finish target.
- Action
- Restrain and convey the workpiece beneath a confirmed stock-removal sequence: either two calibrating heads for broader boards, or one scraping/calibrating roller followed by two flat-grinding heads for narrow split strips.
- Output
- A flatter, more consistent-thickness workpiece with a ground face and defined remaining allowance for subsequent surface polishing or profile processing.
- Buyer
- Stone and quartz processors that must control thickness variation or remove a splitting step before the final abrasive sequence.
- Exclusion
- Calibrating is not fine polishing, gloss generation or edge/profile finishing. The downstream face-finishing route is the stone surface polishing line.
For the narrow-strip process, the upstream relationship is the stone thickness splitting machine. The broader equipment family sits under stone, sintered-stone and countertop equipment.
Keep the two partner machines separate
| Configuration | Input responsibility | Head sequence | Model-bound references | Do not infer |
|---|---|---|---|---|
| YSG-400 / wider two-head family | Broader marble, natural/engineered stone or proposed ceramic boards requiring staged face calibrating | First head for coarse stock removal; second head for a finer calibrating pass | 400 or 600 mm listed working widths; 10–50 mm listed thickness; two 11 kW head motors; head diameters differ by width version | The source’s speed row uses a doubtful mm/min unit, so no speed is published here until partner confirmation |
| YCGU-150 1+2 narrow-strip route | Narrow quartz/engineered-stone strips, especially after thickness splitting has left a small step | One scraping/calibrating roller followed by two horizontal flat-grinding heads | 50–150 mm width, 300–3000 mm length, 5–20 mm thickness; source lists 0.8–1.5 m/min processing speed and 0.5–3 m/min conveyor speed | Its narrow-strip dimensions, three-head logic and minimum length do not apply to YSG-400 |
All values above remain tied to the named source model. Material hardness, incoming flatness, required removal, abrasive/tool choice, cooling, support and acceptance method can narrow the practical range. BASAIR gathers the workpiece data; the cooperating source confirms the final build and supplied values.
Keep the narrow-strip scraping-plus-flat-grinding route separate from the broader two-stage calibrating route. Compare workpiece width and length, incoming thickness variation, stock allowance and the next finishing step; confirm each route from its own configuration sheet.
Stock-removal planning
Do not select a calibrator from nominal thickness alone. Supply a thickness map across representative pieces, identify the highest and lowest points, and state the required final thickness and allowable variation. The removal plan must leave enough material for the next polishing or profiling step without forcing the calibrator to create the final cosmetic surface.
For split strips, record the step at the blade meeting line and whether both faces require work. For broader boards, identify bow, twist, resin-filled areas, fissures and inclusions. One aggressive pass can expose defects or overload a thin workpiece; staged removal may be safer even when the total stock is small.
Grinding tools, restraint and cooling
Tool responsibility
The YCGU-150 source describes a first sintered scraping/calibrating wheel and two diamond flat-grinding wheels. The YSG source describes a coarse first head and a finer second head. Exact wheel diameter, bond, grit, segment form, spindle direction and dressing method must match the offered machine and submitted material. Do not reuse a tool list from the other machine family.
For the wider abrasive path, compare the appropriate magnesite stone abrasive route, but confirm that any abrasive is intended for this machine position; a final-polishing abrasive is not automatically a calibrating tool.
Confirm the order of the scraping and calibrating positions, the downstream flat-grinding stages and the tooling list for the offered line.
Holding and datum
The workpiece needs continuous support and pressure before, under and after each head. State the shortest length and the position of any fragile face. On YCGU-150, the source specifically notes that lengths below 300 mm are outside the stated reference because support through the machine becomes insufficient. A broader YSG board requires its own guide and pressure confirmation.
Water and heat control
Provide water pressure, flow and filtration. Water must cool the contact, carry removed solids away and prevent loading without washing slurry into bearings or electrical equipment. The YCGU source also describes oil cooling around its cartridge-style grinding assembly; whether that system is included and how it is maintained belongs to the final machine confirmation.
Complete site interface
- Upstream: identify splitter, saw or casting process; input orientation; transfer height; and whether loose pieces arrive wet.
- Downstream: state whether the face goes to continuous polishing, profile shaping, edge finishing, inspection or packaging, and specify remaining allowance.
- Electricity: provide voltage/frequency/phase, earthing and available connected load; source values are model references only.
- Water/sludge: show clean/recycled water circuits, filtration, sump, settling or dewatering, clean-out access and discharge responsibility.
- Air: confirm only if the selected pressure or control system requires it; no air demand is assumed from the source photos.
- Floor and access: reserve level support, infeed/outfeed tables, head-lifting and wheel-change clearance, drainage, operator positions and maintenance isolation.
- Safety: final supply must address rotating-tool guarding, splash containment, emergency stops, electrical isolation, lockout and safe wheel-change/jam-clearing procedures under destination-site rules.
Plan supported loading and discharge around the actual blank length, weight and datum. The support arrangement belongs in the proposed layout; a workshop photograph cannot establish project flatness, thickness tolerance or production rate.
Information to submit for configuration
| Submit | Required detail | Selection result |
|---|---|---|
| Workpiece family | Material, width, length, thickness, minimum length, surface and photographs | YSG versus YCGU route and support method |
| Thickness map | Representative high/low readings, step after splitting, bow/twist and rejected defects | Removal stages and trial requirement |
| Target | Final thickness, allowed variation, flatness check and remaining polishing allowance | Head/tool plan and acceptance method |
| Production | Pieces/shift, batch mix, changeovers and shifts | Feed and configuration capacity review |
| Line interfaces | Upstream/downstream equipment, height, direction, buffer and handling | Conveyor and layout scope |
| Site package | Power, water, sludge, air if required, floor plan, safety and environmental rules | Complete offer boundary |