Quartz & Slab Sample Edge Line

Quartz and sintered-stone sample blocks can be finished by a flexible single-edge route or by a two-stage double-edge line. The right choice depends on sample width, thickness, four-edge requirement, chamfer faces, product mix and daily demand—not simply on the number of polishing heads.

Compare the single-edge and two-stage double-edge routes using sample width, the edge section and support through each station.

Overlapping dark rectangular stone samples with visible straight edges
Sample-piece reference for discussing edge appearance and sample geometry. This is not a photograph of the double-edge line or evidence of BASAIR production results.

Request a sample-edge route review

1. Define the sample family before choosing the line

Submit the actual sample sizes, material, thickness, incoming saw edge, required straight-face finish, upper/lower chamfer and the four-edge dimensional rule. Include how many sizes share one thickness and whether all four edges must be finished. Mixed widths do not automatically mean one setting: guides, bearing length, pressure contact and inspection must remain stable for every size.

Large or irregular small pieces may fit the flexible small-stone polishing route instead. Full countertop edges belong to the countertop edge polisher. E419 is specifically for repeatable sample-block straight edges and chamfers.

2. Choose one-edge flexibility or opposing-edge flow

DecisionYSMDP-300 single-edge referenceYCMDR-250/400 double-edge route
Edge ownershipOne straight face plus upper/lower chamfers per pass; index four times for four edgesOpposing edges in one pass; a turn/transfer stage presents the second pair to the next machine
Published head arrangement1 edging + 8 straight polishing + 2 upper chamfer + 2 lower chamferEach machine: 1 pair edging + 6 pairs straight polishing + 2 pairs upper + 2 pairs lower chamfer
Published work window100–300 mm width; 6–20 mm thickness100–250 mm or 200–400 mm width by model; 10–30 mm thickness
Production characterLower layout complexity and manual indexing; useful for more varied sizesDedicated flow with transfer, centring and two edge stages; suited to a stable sample family
Main riskFour-pass handling can introduce orientation or dimensional inconsistencyThe line is only as stable as its turning, transfer, datum and width-change sequence

These are separate partner configurations, not one universal machine with optional labels. The public YCMDR page describes a single-belt 250 mm route and a double-belt 400 mm route; the final line must be selected from actual sample sizes, changeover frequency and the transfer plan.

3. Use published figures only as model-specific screens

The YSMDP-300 source lists Ø200 mm edging, Ø125 mm wet-polishing/chamfer tools, 0–2 m/min, about 350 L/min water, 15.75 kW, 4560 × 2000 × 1450 mm and about 3000 kg. Its published sample examples include 100 × 200, 100 × 300, 150 × 300, 150 × 150 and 200 × 200 mm, but every actual size still needs a support and guide check.

The YCMDR source lists 1–1.7 m/min, 10–30 mm thickness and 23.75 kW for both the 250 and 400 configurations. It lists 4.6 × 1.9 × 1.45 m / about 3000 kg for YCMDR-250-1 and 4.76 × 1.9 × 1.4 m / about 3500 kg for YCMDR-400-2. Its combined-line reference is 12.5 × 2.53 m and 49.15 kW. These are source values for screening, not guaranteed production or acceptance results.

4. Design the wet process, handling and inspection together

Both routes use wet grinding/polishing. Confirm clean-water pressure and flow at each active head, splash containment, drainage and a settling/dewatering route for fine slurry. Published water flow for one model must not be multiplied into a plant requirement without the final head schedule, pump arrangement and recirculation-water quality.

Short sample blocks need continuous support, safe spacing and reliable detection. Confirm the minimum bearing length, centring method, anti-skew guides, turn-table sequence and what happens after a stop. Keep hands outside the feed, turning and opposing-head zones; use guards, interlocks, emergency stops and lockout. Final electrical load, any pneumatic demand, floor loading, access and local workplace compliance require engineering confirmation.

5. Submit one sample-and-flow package

SubmitRequired detail
Sample matrixEach length × width × thickness, material, colour/finish and expected share of volume
Edge definitionFour-edge rule, straight face, upper/lower chamfer, allowance and approved finish sample
Incoming blanksCutting method, dimensional variation, saw marks, squareness and chipped-edge limit
Production basisPieces/shift by size, batches, changeovers, staffing, inspection and rework basis
Line interfacesLoading, centring, turn direction, transfer height, buffers, outfeed and packing handoff
Site utilities/layoutPower, water, air if used, drainage/slurry, floor loading, maintenance space and safe access

See the parent stone, sintered-stone and countertop equipment path and the complete countertop fabrication solution for upstream blank cutting and surrounding finishing tasks.

Send the sample matrix, edge standard and target flow

Tell Us About Your Project

Your details are only used to respond to your enquiry.