Move a slab between defined pickup and placement points with a mobile vacuum-handling machine. This is a mobile lifting and positioning duty, separate from a fixed automatic line loader.

Match suction contact to the actual slab
Smooth-looking surfaces can still leak or mark. Submit samples with the actual finish and contamination condition. Confirm cup positions, load distribution, travel floor, turning space, required tilt and vacuum-loss response before selecting the trolley. No load rating is inferred from a product name.
Define the machine and line boundary
BASAIR reviews the product and factory requirements with you, then confirms the configured equipment, tooling, handling, control connections and installation responsibilities in the project offer. State which upstream and downstream machines already exist and which must be included. A reference arrangement is not a fixed catalog specification.
- Confirm the incoming product condition, location reference and permitted contact surfaces.
- Define the finished output, inspection point, reject route and next operation.
- Provide the factory layout, transfer heights, access, electrical supply and any process utilities.
- Agree on ready, busy, blocked and fault signals and responsibility for restart and manual recovery.
Prepare a representative trial
Use the actual material and the most demanding agreed format. Record finished quality, damaged or rejected pieces, cycle conditions, changeover and recovery. Any capacity, dimensional tolerance or acceptance value belongs to the confirmed configuration and agreed test conditions.
Information for a configuration review
Send slab material, porosity and finish; length, width, thickness and mass; center of gravity; pickup orientation; aisle and placement geometry. Include photos of the current process and mark the desired supply boundary on the layout. These inputs allow the proposal to address the real workpiece and factory interface.
Related review: fixed loading and unloading systems.
Send your product samples and layout for configuration review