Tombstone and stone-edge polishing. Stone-edge polishing for tombstones, stair pieces and countertop components needs a defined edge section, stable presentation and a tool sequence that matches the material. BASAIR can review multi-head arrangements for straight presented edges, small radii, eased profiles and bullnose work.

Choose from the workpiece section and edge finish
The product name does not prove that a slab is held vertically or that every tombstone shape can pass through the same line. Supply the installed orientation and the part drawing before choosing supports, clamps or feed direction.
Fixed grinding and swinging polishing duties
Referenced configurations combine fixed edge-grinding positions with subsequent swinging polishing positions. Other arrangements use paired upper/lower polishing groups with profiling and chamfering tools. The station split should reflect the incoming edge, material removal and intended radius.
For a bullnose or half-bullnose section, show how much stock must be removed and whether the profile is already formed. A polished straight edge, a small eased corner and a full bullnose require different tool contact. A head count alone cannot establish the finished section.
Reference work window and source limits
One referenced multi-head arrangement lists up to 2400 mm working width, 10–50 mm thickness and 0.5–1 m/min conveyor feed. Treat these as a starting configuration reference for layout review. They are not the permissible weight, guaranteed output or capability of every build.
The original catalogue has inconsistent head labels between its title and parameter section. The quotation must therefore include an agreed station drawing and tool list rather than copying the headline count. The selected material, thickness, profile and finish sample govern the final arrangement.
Support heavy and narrow parts through the whole pass
Record the smallest support face, overall workpiece weight, leading/trailing lengths and any cutouts that interrupt pressure. Continuous-feed layouts may use pressure rollers, a non-slip conveyor and auxiliary support racks, but each must suit the actual geometry.
If an upright or irregular workpiece is proposed, ask for a specific fixture and demonstrated feed path. Do not rely on a standard flat-slab picture as proof. Confirm loading, unloading, water supply, slurry drainage, operator access and wheel-change clearance in the layout.
Trial the edge that is hardest to finish
Send representative stone samples, section drawings, size and weight range, current saw marks, finish expectations and batch quantities. Include the number of profile changes and whether both faces are visible after installation.
Inspect the full edge for profile size, transitions, residual scratches and gloss consistency under agreed lighting. Define which ends or corners require a separate operation. For broader profile-line duties see stone profile forming and polishing; for standard countertop external edges see countertop edge polishing.
Send drawings and material details for a configuration review