This machine family finishes the two straight side edges that can remain after the main stone profile has been shaped and polished. It is not a substitute for creating or polishing the front contour. Two partner structures address different line conditions: a 4+4 machine with its own belt drive, and a 3+3 follower that relies on the upstream profile machine for forward motion.
Request a side-edge line review

1. Confirm the unfinished faces and upstream handoff
Submit an end-section drawing marking the already finished contour and the two straight sides still needing work. Give the line width, thickness, length, side-edge allowance, target finish and the exit condition from the upstream machine. If the front/profile face is not yet shaped and polished, start with the profile shaper or integrated profile polishing line rather than treating E412 as a complete profile solution.
The transition must keep long strips supported, centred and at the same working height. A transition roller frame may be required between machines. The side-edge unit’s pressure wheels and guides must restrain the workpiece without damaging the completed contour.
2. Choose an independent belt or a synchronized follower
| Decision | YSR-2: 4+4 independent-belt reference | YSR-1: 3+3 follower reference |
|---|---|---|
| Drive | 55 mm belt and 1.1 kW drive; can run independently or in a line | No belt or transmission motor; upstream line pushes the workpiece |
| Side-edge stations | 4 pairs (4+4 arrangement), Ø125 mm wheel reference | 3 pairs (3+3 arrangement), Ø125 mm wheel reference |
| Work window | 65–200 mm width; 10–80 mm thickness | 30–250 mm width; 10–70 mm thickness |
| Speed basis | 0.5–2.5 m/min source reference; coordinate with upstream when linked | Must follow upstream speed and push; no independent correction for mismatch |
| Best fit | Standalone flexibility, buffering or a line where independent transport is needed | Compact dedicated follower only after the upstream push, height and speed are verified |
These are two separate source-model references, not upgrade levels of one universal machine. The 3+3 route is unsuitable as a standalone unit because it has no independent feed.

3. Match pressure, wheel sequence and synchronization
Both source routes use opposing wet-polishing heads and pressure adjustment. Select the wheel/pad sequence from the side material, saw marks, allowed removal and target finish. The already completed contour becomes a protected surface; guides and pressure wheels must contact stable zones without scuffing it.
For YSR-2, coordinate its belt speed with the upstream exit and provide enough transition length to avoid pulling or compressing the strip. For YSR-1, verify that the upstream machine can push the workpiece through the follower at a stable rate and that the piece remains engaged by both machines during transfer. Speed mismatch, insufficient bearing length or loss of push is a line-design problem, not an abrasive adjustment.
The independent route controls its own feed. The follower route relies on compatible upstream speed, support height and the geometry of the transition.
4. Confirm air, water, power, sludge and safe line access
The source pages describe pneumatic head pressure on both routes. YSR-1 explicitly requires the buyer to provide a small air compressor and connect the air line through its filter/regulator assembly. Confirm pressure, flow, dryness, isolation and whether one compressor serves the upstream line and side-edge unit without pressure drop. YSR-2 also shows individual pressure gauges; its required air consumption must be confirmed rather than inferred.
The YSR-2 source lists a 1.1 kW feed motor and four 2.2 kW edge-polishing motors, while its total-power cell is malformed as “9.6q”; the listed motor values add to 9.9 kW before any other load. The source therefore does not establish a self-consistent total installed power. Final total power and connected load must come from the partner-confirmed motor and electrical list. The same source references about 300 L/min water, a 2.30 × 1.50 × 1.50 m envelope and about 1,800 kg. YSR-1 references 4.5 kW, about 60 L/min water, 1.25 × 1.65 × 1.58 m and about 1,200 kg. Confirm voltage/frequency, installed load, water pressure, return-water quality, drainage and foundation for the actual offer.
Provide splash containment and a route for fine polishing slurry to settling/dewatering. Keep a guarded, level transfer between machines; allow access for width adjustment, wheel changes and clearing a stalled strip. Emergency stops and interlocks should stop the connected line safely, especially where a follower has no own feed. Lockout, non-slip flooring, electrical protection and local workplace rules must be applied to the final layout.
5. Submit one interface package for both machines
| Submit | Required detail |
|---|---|
| End-section drawing | Finished contour, two side edges, width/thickness, allowance and protected contact zones |
| Workpiece range | Minimum/maximum length, mass, straightness and minimum bearing length |
| Upstream machine | Model/layout, exit height, push/drive method, speed range and stop/interlock signals |
| Surface and abrasives | Incoming edge, target sample, wheel interface, grit sequence and allowable removal |
| Production | Metres/shift, profiles/batches, changeovers, inspection and buffer requirement |
| Site utilities/layout | Power, air/compressor, water, slurry route, transition frame, foundation and safe access |
See the parent stone equipment path and the complete stone profile and small-piece processing solution for surrounding operations.