A sink inner-edge polishing machine starts from an already cut opening and turns that blank edge into the specified finished profile. It is not the machine that decides the sink outline, cuts an arbitrary new hole or polishes the countertop’s external perimeter. The buying decision begins with the actual cutout, its corner radius, edge profile and material response.
Request a sink-edge configuration review

1. Separate the cutout blank from the finished sink edge
The opening must first be cut to a controlled blank geometry. Send the sink template or CAD profile, the measured cutout, slab material and thickness, minimum inside radius, edge profile, allowance and target finish. If the opening still needs to be cut or milled, begin with the sink cut-out and milling machine. E417 owns the following grinding and polishing step.
The source model locates from the cut opening rather than relying only on the outside slab edge. That can reduce the effect of outside-edge position variation, but it does not make every sink shape automatically suitable. Camera field, corner radius, clamping zone, tool clearance and the relationship between the inner and outer frame still require a drawing and sample review.
2. Match the opening, profile and finish to the process
| Decision | What the machine can address | What must be confirmed |
|---|---|---|
| Incoming opening | A cut sink blank within the approved locating and clamping window | Template/CAD, measured opening, allowance, chips, taper and cut quality |
| Inner geometry | Rectangular or rounded opening that the selected tool path can follow | Corner radius, transitions, faucet holes, narrow lands and collision zones |
| Edge process | Sequential rough grinding, fine grinding and wet polishing | Removal, tool stack, grit sequence, passes and acceptable edge profile |
| Finished surface | A sample-approved inner edge on the submitted material | Gloss/texture standard, edge feel, inspection light and reject criteria |
| Adjacent work | Only the sink opening in this responsibility | External countertop edges go to the countertop edge polisher |
3. Use the YANMP-1300 figures as a source-model screen
The partner’s YANMP-1300 reference lists one Ø50 × 22 mm wheel/head position, a 300 × 300 to 450 × 850 mm inner-frame window, a 450 × 450 to 600 × 1400 mm outer-frame window, 12–20 mm work thickness and a 20 mm minimum corner radius. It also lists 0.5–2 m/min, 1.5–2 m³/h water, 9.8 kW, 380 V, a 2600 × 2200 × 1700 mm envelope and about 3000 kg.
These values identify one published configuration; they are not a universal BASAIR specification. The source’s “unlimited” maximum-radius entry and fixed three-minute cycle statement are not used as promises. Final speed and finish depend on material, blank quality, opening geometry, removal, tool sequence, loading time, inspection and rework.
4. Confirm water, air, support and safe access
Wet grinding needs clean process water at the head, splash containment and a return route for fine abrasive slurry. Confirm water pressure and quality as well as flow, because the published consumption alone does not define the pipework or pump. The machine description uses cylinders for belt lift and workpiece restraint but does not publish a dependable air-pressure or air-consumption value; the pneumatic schedule must be confirmed or marked not applicable on the signed configuration.
Provide level loading and unloading support so the slab does not tilt across the opening. Verify electrical supply, earthing, isolation, drainage, floor loading, access for tool changes and safe removal of a stalled workpiece. Guards and interlocks must protect the moving head, belts and clamping zone; local electrical and workplace rules apply to the final installation.

5. Submit the cutout and acceptance package
| Submit | Required detail |
|---|---|
| Material and blank | Material name, thickness, dimensions, mass, surface protection and representative cut blank |
| Opening geometry | CAD/template, minimum/maximum inner dimensions, corner radii, edge profile, faucet holes and remaining lands |
| Incoming condition | Cutting method, allowance, taper, chips, dimensional tolerance and before photos |
| Finish and inspection | Approved sample, gloss/texture, edge-feel rule, dimensional checks and reject conditions |
| Production | Pieces/shift, shape mix, loading method, changeovers, inspection and expected rework basis |
| Site interfaces | Power, water, air, drainage/slurry route, floor loading, access and surrounding layout |
See the parent stone, sintered-stone and countertop equipment path and the complete countertop fabrication solution for the cutting and external-edge operations around this step.