Use this page when the purchasing task is repeatable straight subdivision of large slabs—not variable-angle bridge-saw work or small-tile multi-blade production. Small tiles, mosaic pieces and narrow-strip multi-blade cutting belong to the separate E105 Multi-blade Mosaic & Strip Cutter responsibility. BASAIR receives the large-slab job definition and line-interface requirements; the cooperating equipment source confirms the exact head arrangement, workable envelope and supplied configuration before quotation.

Choose staged cutting or a multi-blade strip layout
A staged three-blade configuration with a separate trimming head is intended for repeatable subdivision of sintered-stone slabs. A four-spindle, eight-blade arrangement provides another route for repeated strip schedules. The number of finished strips depends on the blade spacing, incoming width, retained edge and trimming allowance.
Use the cut drawing to decide how many cuts occur together and whether the slab must be re-presented. Powered width adjustment can reduce manual setting work, but does not remove the need to verify blade spacing, parallelism and the smallest retained strip. Keep mosaic or small-tile duties on their separate selection route.
One referenced staged-cut configuration lists 6–20 mm thickness and an 1800 × 900 mm one-into-two cutting condition. A separate eight-blade configuration lists 1400 mm processing size and up to 30 mm thickness. Do not combine these figures into one machine specification. Confirm support, blade sequence and outfeed for the actual material.
Define the cutting job before choosing the blade count
- Input
- Rectangular sintered-stone, engineered-stone, quartz, marble, granite or ceramic slabs with a confirmed incoming width, length, thickness, surface condition and support requirement.
- Action
- Align and restrain the slab, convey it through a wet straight-cut station, and assign successive blade heads to trim edges or divide the slab at fixed positions. Blade sequence and adjustment method are configuration-specific.
- Output
- Repeated rectangular strips or panels with a defined cut schedule, separated for the next inspection, edge-finishing or countertop process.
- Buyer
- Slab processors with recurring straight-cut patterns, enough batch volume to justify continuous infeed and outfeed, and a known downstream handling method.
- Exclusion
- This is not the selection route for nested shapes, rotating or mitre cuts, sink openings, profile milling or one-off bridge-saw layouts. It also excludes E105 small-tile, mosaic and narrow-strip multi-blade cutting, which is a separate machine responsibility. The three-blade reference configuration and the shown four-blade machine are separate configurations; their numbers must not be blended into one specification.
If your work requires rotating geometry or variable-angle cuts, start with the CNC bridge saw. If the cut blanks are specifically for countertop processing, review the countertop cutting machine. The broader route is explained under stone, sintered-stone and countertop equipment.
Configuration selection
| Route | What the source actually shows | Best-fit question | Do not infer |
|---|---|---|---|
| Four-blade large-slab reference | Two blades at the sides of the front row and two blades in the middle of the rear row; ball-screw width adjustment and an edge-alignment block are described. | Do you need repeated edge trimming plus parallel subdivision of one stable slab family? | Do not treat the four heads as four identical cuts or assume every head can occupy any station. |
| reference configuration three-blade CNC route | A separate three-blade continuous machine with CNC size entry and an automatic positioning baffle for batch cutting of large ceramic or sintered-stone slabs. | Is fast digital changeover between repeated straight sizes more important than the shown four-head layout? | Its three-head sequence, working range and controls are not specifications of the four-blade machine. |
| Double-blade request | A valid family request only after the partner confirms whether the two heads are for pre-cut/final-cut, two parallel cuts or a material-specific sequence. | What must each head do, and what enters and leaves the machine? | Do not quote a double-blade arrangement from the three- or four-blade photographs alone. |
Model-bound reference values
On the exact four-blade source page, the pictured build is described with a slab width of 400–1600 mm, slab length of 1200–2000 mm, slab thickness of 14 mm and transmission speed of 4–5 m/min. These values are a reference for that displayed configuration only. Material, blade type, cooling, cut schedule, support and required edge quality can change a workable offer; the partner must reconfirm every quoted value.
Line interfaces that decide whether the machine will work
Infeed, alignment and restraint
Send the actual slab size and weight, not only a nominal format. BASAIR needs to know whether the slab arrives from a bridge saw, rack, roller table or suction loader; whether the leading edge is already square; and whether a film, textured face or fragile surface limits the use of rollers or pressure devices. The infeed support must prevent sag, impact and a sudden change in level at the cutter.
The side guide and positioning baffle establish the cut reference. A repeatable machine cannot compensate for an unstable datum. Confirm which edge is the datum, the allowable incoming edge deviation, how the slab is held against the guide and how offcuts are controlled after the last blade.
Blade sequence and tool specification
Provide the material name, body construction, thickness, cut widths, whether an original edge must be removed, the required kerf allowance and the acceptable edge condition. The cooperating source then confirms blade diameter, bond and segment design, spindle sequence, rotation direction and whether a pre-cut/final-cut strategy is required. A blade that is suitable for one ceramic body is not automatically suitable for quartz, granite or a resin-rich engineered slab.
Outfeed and downstream work
The outfeed must support every resulting strip, including the narrowest offcut. State whether the next step is edge polishing, 45-degree preparation, profile shaping, surface finishing, inspection or packaging. For a full large-slab route, see sintered-stone slab processing. Cut edges should be inspected before they enter an irreversible downstream operation.

Water, electricity, slurry and safe access
- Water: confirm clean-water pressure and flow at each blade, filtration or settling provision, and how water is kept off motors, sensors and the surrounding walkway.
- Slurry: size channels, sumps and settling capacity for the actual material removal. Keep recirculated solids below the level allowed by the blade and spindle supplier.
- Electricity: provide site voltage, frequency, phase, earthing arrangement and available connected load. Final motor powers belong to the confirmed machine configuration.
- Air: if the selected alignment or clamping system is pneumatic, provide pressure, flow and air quality; do not assume air demand from a photograph.
- Floor and space: reserve level floor support, full infeed/outfeed length, operator sightlines, maintenance withdrawal space and a safe route for slab handling.
- Safety: include blade guarding, interlocked access where required, emergency stops reachable from operating positions, lockout points, splash control and a documented method for clearing broken pieces. The final design must be reviewed against the destination site’s rules.
Information to submit for configuration
| Submit | Minimum detail | Decision it supports |
|---|---|---|
| Material and samples | Material name, body construction, finish, thickness range and representative offcuts | Blade, cooling and support selection |
| Input/output schedule | Incoming slab sizes; finished strip sizes; kerf allowance; edge-trim requirement | Head count, positions and cut sequence |
| Volume and changeover | Pieces per shift, batch sizes, shifts and daily size changes | Continuous-line value and adjustment method |
| Upstream/downstream | Machine, transfer height, direction, support method and downstream process | Conveyor and handling interfaces |
| Site utilities | Voltage/frequency/phase, water pressure/flow, air if used, slurry route and floor plan | Complete supply boundary and layout |
| Acceptance method | How width, squareness, edge defects and throughput will be checked | Project-specific test plan; no unsupported guarantee |