This machine family processes square-section stone columns and baluster blanks one face at a time. A complete four-sided part requires four controlled passes with consistent indexing between faces. It is not a rotary lathe or a solution for round columns. BASAIR can define the workpiece, wheel and line-interface requirements and coordinate the partner configuration.
Plan each face separately. Agree the support, indexing sequence and material allowance for the four registered passes.
Request a square-column processing review
1. Start from a square-section drawing and four-pass plan
Submit the end-section drawing, overall length, four face widths, corner condition and any repeated relief along the length. The source machine shapes and polishes the upper working face during one pass; the part is then turned to the next face. The indexing method—manual handling, marked orientation, roller table or a dedicated fixture—must keep the four faces aligned and avoid presenting an unstable face to the conveyor.
Round, oval or continuously rotating balusters require different holding and tool motion and are outside this page. A decorative square baluster may have curved relief on each of its four faces, but the base section and pass logic remain square and indexed.
2. Select the wheel set around the section and material
| Punto de selección | YSXP-800 source reference | Confirmación del proyecto |
|---|---|---|
| Spindle sequence | 4 electroplated shaping wheels + 4 polishing wheels | Finished section, removal per wheel, material hardness and target surface |
| Face processing | One face per pass; four cycles for a complete square column | Turnover method, datum face, orientation marking and allowable mismatch between faces |
| Capacidad de referencia | Up to 800 mm width and 100 mm thickness; 0.3–2 m/min | Actual section, length, relief depth, starting blank and sustainable feed after sample testing |
| Material | Source highlights soft stone and engineered-stone applications | Stone sample, vein/fissure condition, reinforcement and permitted edge damage |
These values identify the cited partner model, not a universal BASAIR specification. The source’s labour and finish marketing statements are not adopted.
3. Integrate blank preparation, hold-down and four-face handling
Upstream cutting should provide a straight blank with enough allowance for the deepest profile and a repeatable datum. During each pass, the fence and pressure rollers must restrain the workpiece without marking the finished face. Long or heavy pieces need entry and exit support at the same elevation; short pieces require a minimum contact check before automatic feeding is accepted.
The first four stations use profile-matched electroplated wheels in the source arrangement; the later stations refine the shaped face. Wheel geometry, spindle interface, grit progression and compensation settings must be approved against the drawing and sample. After each pass, clean the face, inspect the profile, rotate the piece to the next indexed face and repeat. Downstream work may include final hand correction at transitions, inspection, drilling or installation preparation.

4. Plan power, possible compressed air, cooling water, sludge and safe turnover
The YSXP-800 source table lists 109.5 kW total power, a 6.0 × 2.1 × 2.3 m machine envelope and approximately 11,000 kg weight. It also describes high-flow clean-water delivery at the wheels but does not give a reliable total water figure. Confirm voltage/frequency, installed load, water pressure and flow, drainage, foundation, floor loading and lifting access for the final configuration.
The public source does not establish whether the final machine requires compressed air or provide any air-consumption value. If the approved hold-down, actuator or blow-off arrangement contains pneumatic components, confirm pressure, flow, air quality, moisture control, connection and isolation with the partner. If the final configuration contains no pneumatic function, record compressed air as “not applicable” in the utility schedule rather than inventing a demand.
Wet shaping produces heavy stone fines. Provide a guarded collection path, suitable screening/settling or dewatering, and return-water quality that will not block nozzles or damage the finish. The four-pass method adds a handling hazard: define lifting aids, turnover space, supports and a safe sequence so operators do not rotate heavy pieces by uncontrolled manual effort. Guarding, emergency stops, lockout, splash control, non-slip access and local machine-safety requirements must be checked for the installed line.

5. Submit the data needed for a four-face approval
| Enviar | Datos obligatorios |
|---|---|
| Section and elevation drawings | All four faces, corner/radius, relief depths, length and tolerances |
| Stone and blank | Material, starting L × W × T, fissures/reinforcement and machining allowance |
| Four-pass method | Datum face, turnover/fixture method, orientation marking and inspection between passes |
| Wheel and surface target | Existing wheel data if any, target sample and permitted face-to-face mismatch |
| Production and handling | Pieces/shift, product mix, piece mass, entry/exit support and lifting aids |
| Servicios del sitio | Power, water, drainage/sludge route, foundation, layout and safe maintenance clearance; state whether compressed air is required or not applicable, and if required confirm pressure, flow and air quality |
For continuously shaped straight profiles rather than four indexed faces, compare the stone profile shaping machine y el stone profile polishing machine. See the wider stone equipment path o el stone profile and small-piece solution for line context.