Stone, sintered-stone and countertop equipment covers several distinct processing routes: slab cutting, thickness correction, surface polishing, profile work, small-piece or mosaic finishing, and fabricated countertop operations. The finished geometry and material decide the route; one “stone machine” cannot represent all of them.
Descubre máquinas y configuraciones

CNC Bridge Saw
Compare straight or double-head bridge cutting, three- to five-axis arrangements and combined sawing/milling. Select functions from the drawing and workholding requirements.

Multi-Blade Slab Cutting Machine
Continuous slab dividing with staged three-blade, four-blade or multi-shaft arrangements. Match blade spacing, slab support and the finished piece layout.
Sintered Stone Mitering Machine
Compare moving-head or continuous multi-head 45-degree mitering. Define retained ends, full-length edges, joint section, material support and finishing allowance.

Máquina pulidora de bordes de encimeras
Shape and polish visible countertop edges with a supported feed route. Match the profile, material and finishing sequence to the fabrication drawing.

Stone Profile Polishing Machine
Combine stone-profile shaping and polishing stages. Specify the section, polished faces, workpiece support and tool sequence rather than selecting by appearance alone.

Máquina para el acabado de los bordes de los salpicaderos de encimera
Form and polish narrow countertop backsplash strips. Check strip stability, edge section, visible surfaces and transfer support across the machine.

Máquina manual para cortar piedra
Operator-fed straight or 45-degree stone cutting. Compare support bed, cutting travel, workholding and the finished part geometry. AI-edited configuration reference.

Round Table Cutting & Profiling Machine
Circular-table cutting, milling or profile finishing for suitable stone workpieces. Review part shape, rotation, clamping and the required tool access. AI-edited configuration reference.

Tombstone Edge Polishing Machine
Polish selected tombstone or stone edges. Define the supported faces, edge geometry, workpiece envelope and inspection sample before configuring the machine.
Information needed for stone or countertop equipment selection
- Exact material name, composition if available, surface, thickness and slab or blank dimensions
- Dimensioned finished drawing with cut lines, holes, grooves, edge profiles and polished faces
- Incoming condition and target thickness, flatness, edge and surface result
- Largest, smallest and most common products; daily mix, batch quantities and required output
- Existing cutting, calibrating, polishing and handling stages plus the proposed operation sequence
- Tooling/cooling preference if fixed, accepted samples and inspection method
- Loading method, factory layout, electrical supply, water, compressed air, drainage and sludge route
Request a stone or countertop process review
Available machine structure, working range, output, tool route and acceptance method depend on the customer’s material, geometry, configuration, utilities and engineering confirmation.
Choose by workpiece and visible edge
A slab cutting route, a countertop edge route and a shaped-stone profile route can require different locating and tooling methods. Submit the finished drawing and identify visible surfaces, joints, openings and mounting references before selecting individual stations. A machine suitable for one material or edge is not automatically validated for the entire product mix.
For a dedicated equipment or tooling review, see Máquina manual para cortar piedra, Round Table Cutting & Profiling Machine.