Slot grinding and polishing wheels work after a groove has been opened. They reshape the groove section, remove the marks left by the first cutting tool and refine the groove surface. They are not the blade that makes the first slot. BASAIR identifies a workable sequence from the actual groove section, machine interface and current process rather than approving a replacement from diameter or colour alone.
Send your slot drawing and installed-wheel photos
Separate the first cut from the finishing sequence
A diamond grooving disc or other approved first-cut tool establishes the initial groove blank. The later wheels must enter that blank without overloading the edge, then bring the cross-section and surface to the required condition. Treating a shaping wheel as the first grooving blade can produce the wrong interface, the wrong contact geometry and an unstable process.
| Process position | Primary responsibility | Input it receives | What must be matched |
|---|---|---|---|
| Initial grooving | Open the slot and establish the rough width and depth. | Uncut tile or slab. | Material, target depth, cut route, spindle interface, cooling and permissible edge damage. |
| Profile shaping | Correct the slot section and progressively remove first-cut marks. | A repeatable groove blank with enough allowance for the required profile. | Flat, V, concave, convex or other section; working-face profile; bond; grit progression; clearance and rotation. |
| Fine grinding and polishing | Reduce the remaining scratches and reach the agreed visual or tactile finish. | A stable, correctly shaped slot. | Incoming roughness, target surface, material response, water route, line speed and the number of available stations. |

The groove section decides the wheel profile
A flat-bottom slot, a V-slot and a concave or convex decorative section do not share one working-face shape. The wheel profile must follow the target drawing and the allowance left by the upstream tool. A nominal groove width alone is not enough: corner radius, side angle, bottom shape and the permitted change to the tile face all affect contact.

One partner-machine configuration: 3 shaping plus 5 polishing positions
A published Yongtao YTKP-1200 partner-machine example uses three shaping positions followed by five polishing positions. Its published wheel reference is Φ150 × 30 mm for both wheel groups. This is one machine-specific configuration used to understand the sequence; it is not a universal BASAIR wheel specification and does not mean that every eight-position machine accepts the same wheel body, bore, flange, side or rotation.

For a new line, review the complete máquina para el tallado y pulido de ranuras decorativas. For a back, edge or hanging groove, start with the máquina para ranurar la parte posterior de las baldosas. The machine route sets the number of positions, access direction, water path and available clearance; the wheel sequence must then be engineered inside those limits.
Information required for an engineering identification
| Qué enviar | Minimum useful detail | Por qué es importante |
|---|---|---|
| Machine and position | Brand, model, station number, head or spindle ID, current 3-shaping/5-polishing arrangement if applicable. | Prevents a wheel family from being assigned to the wrong station or sequence. |
| Photos | Current wheel front, back and side; installed wheel and guard; upstream blade; actual groove blank and finished result. | Shows mounting direction, available clearance and the condition entering and leaving the station. |
| Dimensions and interface | Outside diameter, total width, working-face width, bore or shank, flange/recess/shoulder, fasteners, side and rotation. | A diameter such as Φ150 mm does not confirm the complete installed interface. |
| Slot drawing | Target width, depth, side angle, bottom shape, corner radius and permitted dimensional tolerance. | Defines the wheel contact profile and the allowance needed between stages. |
| Current abrasive data | Bond, grit sequence, working-face form and any current supplier code. | Provides a starting point; it does not by itself approve a replacement. |
| Material and process | Tile or slab type, thickness, feed, spindle speed, dry/wet route, water delivery and current defects. | Bond and progression depend on heat, debris removal, material response and contact time. |
| Target surface and quantity | Reference sample or acceptance description, trial quantity and expected production quantity. | Lets engineering separate identification, trial planning and production supply. |
Common questions
Can a slot grinding wheel make the first groove?
Not as a default assumption. This page covers the shaping, fine-grinding and polishing stages after the initial groove has been cut. Confirm the first-cut tool separately.
Does Φ150 × 30 mm identify a replacement?
No. That size belongs to the cited partner-machine example. Bore or shank, flange, working-face profile, side, rotation, guard clearance and process position still require confirmation.
Can the same wheel profile polish flat, V and curved slots?
No universal profile should be assumed. The target cross-section and incoming groove determine the contact geometry and stage progression.
Is this always a wet process?
The illustrated partner machine is a wet-processing example. Final dry or wet suitability depends on the host machine, wheel construction, material, heat and debris-control route.
Will photos alone approve the replacement?
No. Photos help identify the station and interface, but the dimensions, groove drawing, process data and target result are also needed for engineering confirmation.