Máquina para ranhurar o verso de azulejos

This page is for a wet, two-head machine that machines an L-shaped step on the back edge of tile, then smooths that step. It is not a general surface-slotting page: a photo of an ordinary straight groove does not prove the rear L-step operation described here. BASAIR collects the workpiece and line requirements; the cooperation manufacturer confirms the exact machine, wheels, utilities and supply boundary before quotation.

Reference wet tile back-grooving machine with conveyor and pressure rollers
Reference machine overview. The image shows the conveyor and pressure arrangement; the wet L-step process and wheel sequence are established by the corresponding product source, not by this view alone.

1. Use this machine only for a rear L-shaped step

The intended task is a step at the rear edge of ceramic tile: the first operation removes material to create the L-shaped back step and the second operation smooths the flat step surface. Start with the required cross-section, not with a generic request for a “groove machine.”

Buyer taskFit for this page?Próxima decisão
Wet rear-edge L-shaped stepYesConfirm step width, depth, orientation, material and finish
Front-face decorative grooveNoUse the decorative forming-and-polishing route
General cutting or an unspecified straight slotNot enough informationReturn to tile secondary-processing selection with a section drawing

2. Define the back step before choosing wheels

Send a dimensioned cross-section and identify the face that must remain visible. The machine and wheel set cannot be selected safely from overall tile size alone.

Input to provideWhy it changes the configurationEvidências úteis
Tile material, backing and fired-body conditionChanges removal behavior, wheel specification and water managementRepresentative samples and close photos of the back
Overall length, width and thicknessDetermines support, pressure and infeed/outfeed handlingDimensioned drawing and size range
L-step width, depth, edge offset and orientationDefines the removal and smoothing geometryCross-section with tolerances and a marked reference face
Required surface condition and visible-edge protectionSets the acceptance sample and handling precautionsApproved sample or defect limits for chipping and scratches

The wheel interface should be checked together with the diamond grooving-disc and slot grinding and polishing-wheel requirements; names alone do not establish diameter, bore, profile or bond.

3. Keep coarse shaping and smoothing as two distinct duties

The two-head rear-step configuration source describes a first, sintered wheel that machines the rear L-shaped step and a second, resin wheel that smooths the L-shaped flat. Both heads are manually adjustable vertically and laterally in that documented configuration. Treat these as model-specific reference facts, not as a promise that every quoted machine uses an identical head, motor or wheel.

Close view of a tile back-grooving machine workhead and conveyor layout
Close view of the workhead and conveyor area. The crop does not by itself prove the complete two-stage duty; that sequence comes from the exact source-page description.
Tile back-grooving machine feed belt and pressure-roller arrangement
Feed belt and pressure-roller arrangement on the reference machine. Final support pressure, reference fence and feed direction require confirmation with the submitted tile.

4. Confirm wet-process, line and acceptance interfaces

The documented model is wet-process equipment with water covers around the grinding heads. The factory must still confirm water quality, supply pressure and flow, drainage, slurry capture, electrical standard, direction of travel and safe access for the actual project.

Reference or interfaceDocumented referenceConfirmação do projeto
Processing speed1–4 m/min for the two-head rear-step configuration reference modelValidate with material, removal depth, wheel set and sample result
Processing thickness10–30 mm for the two-head rear-step configuration reference modelConfirm actual tile range and pressure/support setting
Água e lamaWet heads with water covers; no fixed project flow claimed hereSupply, return, filtration or settling, drain point and cleaning access
Line connectionConveyor-fed reference machineInfeed/outfeed height, tile reference edge, available footprint and upstream/downstream control
AceitaçãoNo unconditional result promisedApprove a sample against step dimensions, consistency, chipping and required surface condition

For a workshop-level layout, place this duty within the tile secondary-processing workshop flow and identify where wet slurry is collected.

5. Send a complete back-step brief

Include material, size and thickness range, a dimensioned L-step drawing, target finish, representative samples, daily or hourly demand, current upstream and downstream equipment, available footprint, electrical supply, water and slurry arrangements, required feed direction and project location. BASAIR will use that package to confirm the cooperation-supplied machine, wheel interfaces and quotation boundary.

Request a back-grooving configuration review

Dry-hang slots are a separate configuration decision

The rear L-step machine described above must not be assumed to make every dry-hang fixing slot. The wider supply family also includes manual and automatic dry-hang grooving arrangements, including multi-blade machines intended for edge slots, partial-edge slots or local bracket clearances. Each requires its own tool path, workpiece support and approved slot drawing; a generic groove photograph cannot prove compatibility with a facade fixing.

For a dry-hang inquiry, submit the panel material, thickness, edge distance, slot width, depth, length and end geometry, with the fixing interface drawing and required datum. State whether slots run along the edge or stop at defined positions. Confirm blade access, clamping, breakout control and inspection of residual material. Machine selection does not certify the facade or anchorage system: structural suitability and acceptance of the fixing remain with the responsible project design and agreed tests. Retain the wet rear-L-step route only when that is the specified geometry.

Conte-nos sobre o seu projeto

Seus dados serão utilizados exclusivamente para responder à sua consulta.