Equipamentos para processamento secundário de azulejos

Tile secondary-processing equipment converts fired ceramic tile, porcelain tile or slab stock into a new size, edge, groove or assembled product. The correct machine route starts with the finished part drawing: cutting a strip, producing a 45-degree decorative joint, forming a bullnose, making a back groove and flattening an inlay are different clamping and tooling problems.

Conheça as máquinas e as configurações

Information needed for a secondary-processing proposal

  • Material, surface, thickness and photos of the incoming tile or slab
  • Dimensioned finished-part drawing with decorative face and working edges marked
  • Raw size, finished size, allowance, batch quantities, product mix and required output
  • Required operations in order: cutting, straight-edge grinding, mitering, profiling, grooving, polishing or pressing
  • Accepted samples or measurable criteria for edge, groove, flatness and appearance
  • Available footprint, loading method, line direction, working height and upstream/downstream equipment
  • Electrical supply, water, drainage, compressed air, dust collection and sludge route

Request a tile secondary-processing review

Machine layout, working range, output, tools, utilities and acceptance criteria are project-specific and depend on the customer’s material, finished geometry, selected configuration and engineering confirmation.

Choose the route by finished product

Start from the finished tile geometry: resized rectangles, narrow strips or mosaics, beveled edges, rounded skirting edges, back grooves or a special profile. A combined cutting and edge-processing line suits a repeated route only when its size range and changeover match the production mix. Retain a separate station where a special operation would otherwise limit the full line.

For a dedicated equipment or tooling review, see Tile & Slab Inline Cutting Production Line.

Conte-nos sobre o seu projeto

Seus dados serão utilizados exclusivamente para responder à sua consulta.