This page covers wet forming and polishing of front-face L, V and flat-bottom decorative grooves. The reference configuration uses a forming stage followed by a polishing stage; it does not cover rear back steps or unrelated edge-profile work. BASAIR collects the profile and production brief, while the cooperation manufacturer confirms tooling, machine configuration, utilities and supply boundary.

1. Choose the front-face groove route before selecting a machine
Start from the finished front-face section. An L groove, a V groove and a flat-bottom groove require different wheel profiles and approval samples even when they run on the same two-stage machine concept.
| Requested result | Rota | Critical first input |
|---|---|---|
| Front-face L groove | Form, then polish | Dimensioned asymmetric cross-section and reference face |
| Front-face V groove | Form, then polish | Included angle, depth, opening and tip condition |
| Front-face flat-bottom groove | Form, then polish | Width, depth, corner radii and floor finish |
| Rear L-shaped step | Outside this page | Use o tile back-grooving machine route |
If the process path is not yet fixed, begin with tile secondary-processing equipment selection.
2. Freeze the profile and finish target before configuring heads
The buyer’s drawing and sample define the duty. A model name, overall tile size or photograph of a groove is not enough to select forming and polishing wheels.
| Input to provide | Configuration decision | Prova de aceitação |
|---|---|---|
| Material, glaze or surface, body condition and thickness | Wheel bond/profile, support, pressure and water management | Representative samples from the intended production material |
| L, V or flat-bottom cross-section with dimensions | Forming-wheel geometry and matching polishing-wheel geometry | Signed drawing and approved profile sample |
| Groove position, pitch, orientation and usable tile face | Reference fence, feed direction and repeat positioning | Position and repeatability checks on agreed samples |
| Required finish and defect limits | Polishing sequence, pressure and sample-test plan | Agreed limits for scratches, chipping, haze and profile continuity |
Confirm the machine interfaces together with the diamond grooving-disc and slot grinding and polishing-wheel requirements. The forming and polishing tools must match the same approved profile.
3. Separate forming duty from polishing duty
The YTKP-1200 source page documents three forming positions followed by five polishing positions. It describes replaceable profile wheels in the forming stage and profile-matched resin wheels in the polishing stage. That “3 + 5” statement comes from the exact source text and parameter table; the photos below show local machine areas and must not be used to count or independently prove the head total.


4. Confirm air, water, feed and sample acceptance
The documented polishing heads use pneumatic movement, and the source states that an external air compressor is required. Each forming and polishing position is described with water delivery. Final utility sizing, electrical standard, drainage and slurry treatment still require project confirmation.
| Reference or interface | Documented YTKP-1200 reference | Confirmação do projeto |
|---|---|---|
| Stage sequence | 3 forming positions + 5 polishing positions | Confirm each wheel profile and the approved sample sequence |
| Compressed air consumption | 50 L/min | Confirm pressure, air quality, compressor margin and connection point |
| Water consumption | 400 L/min | Confirm supply pressure/quality, return, filtration or settling and drain route |
| Model designation | YTKP-1200 | Do not infer working width from “1200”; submit the actual tile size range |
| Line and acceptance | Conveyor-fed wet reference machine | Confirm direction, heights, footprint, controls and sample criteria before release |
Place the machine, utilities and slurry return in the broader tile secondary-processing workshop layout rather than treating the machine as an isolated purchase.
5. Send a profile-led quotation brief
Send the material and surface, tile size/thickness range, an L/V/flat-bottom groove drawing, target finish, position and pitch, accepted samples, demand and shifts, upstream/downstream machines, footprint, feed direction, electrical supply, compressed air, water and slurry arrangements, project location and planned timing. BASAIR will use that package to coordinate the cooperation-supplied configuration and quotation boundary.