Motores y cabezales de pulido are replacement assemblies whose fit depends on both electrical/mechanical data and their exact machine location. Chamfering motors, squaring motors and polishing-line heads perform different work and can use different shafts, bases, orientations and tool interfaces.
This page gives a practical identification route for existing tile lines. BASAIR confirms a replacement only after the nameplate, mounting, shaft/head interface, direction and installed position have been documented.

Identify the assembly by station, not by motor color
| Assembly | Line location | Decisive identification |
|---|---|---|
| Chamfering motor | Upper/lower or other confirmed chamfering position on an edge line | Electrical nameplate, speed, shaft/tool interface, upper/lower orientation, base, adjustment and rotation |
| Squaring motor | Dry or wet squaring head on a squaring line | Nameplate, dry/wet arrangement, spindle, bearings/seals, mounting centerlines, left/right side and coolant interface |
| Polishing-line head | Oscillating/rotating head on a continuous polishing machine | Head model, input/drive, mounting, head motion, tool holders, lubrication/cooling and installed station |
Separate the motor, spindle and complete assembly
State whether the requirement is the electric motor only, the spindle only, a motor-spindle unit, an adjustable carriage or the complete station assembly. Photograph the boundary of the requested supply. A motor with the correct power and voltage can still be incompatible because its frame, shaft, speed, flange, sealing or orientation differs.

- Record every nameplate field in a square, legible photograph.
- Measure shaft diameter/length, key or thread, flange, bolt centers, base height and tool-clearance envelope.
- Mark rotation viewed from a stated end and note left/right, upper/lower and infeed/outfeed orientation.
- Identify water, air, grease, oil or seal connections and their positions.
- Describe the failure: electrical trip, noise, heat, leakage, runout, vibration, bearing damage or loss of adjustment.
A polishing head must match both machine motion and tool holder
Identify the head on the line layout and state the installed tool family—such as a long Fickert-form tool—without assuming that all heads on a similar machine are identical. Record input coupling, mounting face, center height, head diameter, holder count, holder dimensions, oscillating/rotating behavior and lubrication.
For a head used on a máquina pulidora para líneas de baldosas cerámicas, include the tool-holder family and the station’s role in the abrasive sequence. For cross-checking the full evidence set, use the planned Guía de compatibilidad de máquinas, herramientas y piezas de recambio.
For a complete head replacement, send a video of the head at low/safe operating condition if available, plus photos of an adjacent working head. For an internal repair part, supply the disassembled part, drawing or precise measurements; the outer head photo alone cannot identify bearings, gears or seals.
Required evidence set
- Wide photo of the line and marked station.
- Four-side photos of the complete assembly in place.
- Nameplate and all labels in focus.
- Mounting base/flange, shaft or output interface and utility connections with a scale.
- Removed-part front/back/side photos if removal is safe and already planned.
- Dimension sketch with units, datum points, hole centers and left/right orientation.
Information needed for a motor or polishing-head inquiry
- Machine manufacturer, model, serial and exact station/side
- Requested supply boundary and quantity
- Nameplate data, electrical supply, speed and rotation
- Mounting, shaft/tool-holder and utility-interface dimensions
- Current part number/drawing and photographs listed above
- Failure symptoms, urgency and whether a working sample is available for verification
Send motor or polishing-head evidence for identification
Replacement compatibility depends on the exact machine location, nameplate, electrical data, mounting, shaft/head interface, utilities and engineering confirmation.