Prensa para nivelamento de incrustações de azulejos e mosaicos

Input: Cut, washed and dried ceramic-tile or stone inlay pieces that have been arranged into the required pattern and coated with the selected adhesive on the back.

Machine action: The patterned face is supported against a transparent reference surface while adjustable pressure heads or spring-loaded pins act on the back; optional heating may assist only when it matches the adhesive supplier’s curing requirements.

Output geometry: A flattened inlay assembly checked by the measurement method agreed for the project, ready for turning, joint filling and curing. This output does not by itself guarantee final flatness after handling, curing or installation.

Buyer: Waterjet inlay and mosaic processors, ceramic-tile or stone secondary-processing factories, and their project buyers or process engineers.

Exclusion: This station does not cut or polish. It does not guarantee bond strength, final flatness, cycle time or breakage-free production.

A tile inlay flattening press is a dedicated assembly station between waterjet or CNC cutting and the later turning, joint-filling and curing operations. Its value is not simply “more pressure.” The machine must hold an agreed face reference while applying controlled support across pieces that may differ in shape, thickness and area. Work envelope, total force, pin travel, adhesive behavior and the buyer’s inspection method therefore have to be selected together.

Send your inlay drawing and process details

Vista frontal de uma prensa para nivelamento de mosaicos com duas mesas de trabalho transparentes e uma seção de pressão superior
Representative partner-supplied machine structure. The proposed working size, force system and heating package are confirmed for each project.

Where the press fits in the inlay workflow

  1. Cut and identify the pieces. Waterjet or another suitable cutting process creates the shapes. The cutting machine, nesting method and edge allowance remain separate responsibilities.
  2. Wash and dry. Abrasive, sludge, dust and free water are removed. Residue or moisture can interfere with adhesive behavior and the reference surface.
  3. Arrange and inspect the face. Pieces are placed face-down against the clean reference surface or within a project-specific locating frame. Pattern orientation, joint gaps and foreign particles are checked before adhesive is applied.
  4. Apply the specified adhesive to the back. Adhesive identity, mix ratio, coating method, open time and cure conditions come from the selected adhesive system—not from a generic machine setting.
  5. Press against the reference. Adjustable heads or spring-loaded pins accommodate the approved thickness distribution and apply pressure from the back while the visible face is supported by the reference surface.
  6. Release, turn and continue processing. The assembly proceeds to turning, front-joint filling, curing, cleaning and packing according to the factory route.

The press therefore does not correct inaccurate cutting, contaminated bonding faces, an unsuitable adhesive or an unsupported handling method. Those conditions must be controlled before the cycle starts.

Patterned tile and stone inlay assembly being lifted from a transparent worktable beside the press
A formed inlay assembly at the handling stage. The lifting and turning method must support the piece without undoing the face reference established during pressing.

Reference surface and independently adjustable pressure points

A transparent working surface gives the operator a face-side reference and can allow the pattern to be checked from below before pressing. Its material, thickness, support frame, allowable load and replacement method must be confirmed for the selected working area. It also has to be kept free of adhesive, grit and chips; a single hard particle can mark a polished face or create a local high point.

On the back side, a field of pressure heads or spring-loaded pins can follow approved thickness differences better than one uncompensated rigid plate. Pin pitch, contact tip, travel and spring range matter as much as total machine force. Too little travel can leave areas unsupported; too much local load can damage a thin or weak piece. A sample pattern is the most useful way to establish contact layout and a safe operating window.

Close view of the spring-pin pressure array above a transparent reference table
The pressure array acts on the back of the arranged pieces. Pin layout, travel and contact material are configuration items, not universal constants.

How to select the configuration

Public supplier pages confirm that this equipment category is offered with multiple working sizes and pressure configurations. That cross-check establishes configurability only; it does not establish a BASAIR size or force range. Required working area and total force must be confirmed from the loaded area, piece geometry, contact pattern, adhesive behavior and the permitted load on the material.

One partner listing for the YF-1200 describes 1000 mm and 1200 mm work sizes and a 5-tonne maximum, while also mentioning a custom size up to 2 × 2 m. The 5-tonne and 2 × 2 m statements are preliminary sourcing clues only. A 2 × 2 m request needs separate confirmation of frame stiffness, reference-surface support, pin coverage, total force, heating uniformity, handling and transport; it must not be treated as a standard YF-1200 promise.

Ponto de seleçãoChoose from the workpiece and processO que deve ser confirmado
Working envelopeLargest assembled panel, locating frame, edge clearance and loading directionUsable area rather than nominal model name; table support and access around the piece
Pressure fieldPiece size, thickness spread, fragile zones, adhesive coverage and loaded areaTotal force, controllable range, pin pitch, pin travel, contact tip and sample result
Hydraulic or pneumatic actuationRequired force, pressure stability, available utilities, maintenance practice and contamination sensitivityActual offered circuit, rated components, gauges, valves, guarding and service points
Heating assistanceAdhesive technical data, substrate sensitivity, coating thickness and ambient conditionsWhether heat is permitted, temperature-control method, uniformity and safe surface limits; no fixed temperature or time is assumed
Single or alternating tablesBatch size, arrangement time, pressing time and operator accessTransfer motion, locating repeatability, lifting/turning aid and clear floor area
Método de inspeçãoDrawing tolerance, visible-face requirement and installation methodReference points, support orientation, gauge or straightedge method, check timing and sampling plan

Published configuration conflict that must be resolved before quotation

The reviewed partner page is not internally consistent. It calls the machine hydraulic and lists hydraulic oil, but elsewhere describes a pneumatic structure and adjustable air pressure. Its electrical table also mixes “0.37-380V,” a separate 1.5 kW motor entry, a 2.4 kW temperature-control entry, and “220 V, 50 Hz, three-phase four-wire.” These values cannot be combined into one dependable specification.

For that reason, BASAIR will identify the actual offered pressure circuit and issue one matched utility schedule for the selected configuration: supply voltage, frequency and phase; installed and running power; heating load; hydraulic power-unit details or compressed-air pressure and flow; protection devices; cable and isolator responsibility; and the buyer’s local electrical requirements. The quotation must not copy both hydraulic and pneumatic claims into the same standard machine.

Side view of a tile inlay flattening press showing the control panel and enclosed pressure section
Representative control-side arrangement. Final controls, pressure circuit, heating load and site power are matched in the project configuration.

Information needed for a useful equipment proposal

EnviarMinimum detailWhy it changes the configuration
Material and patternCeramic, porcelain, marble, granite or mixed material; drawing; photographs; piece count and smallest pieceChanges contact layout, surface protection, handling and breakage risk
Dimensions and variationOverall length/width, piece thickness range, face finish, joint width and cut toleranceSets usable table area, pin travel, frame and locating method
Adhesive systemProduct identity, technical and safety sheets, mix ratio, coating method, open time, cure conditions and permitted heatingDetermines whether heating is suitable and how pressing time is established
Target and measurementDrawing requirement, straightedge/gauge method, reference support, inspection timing and sample acceptance rulePrevents an undefined “flat” claim and separates press output from later cure or installation effects
Production planPanels per shift, batch mix, arrangement time, desired staffing and planned product changesGuides single/alternating tables, handling aids and the realistic cycle study
Upstream and downstreamCutting machine, washing/drying method, arrangement and glue application; turning, joint filling, curing, cleaning and packing routeDefines interface height, carriers, contamination control and transfer responsibility
Terreno e serviços públicosLayout, doors, floor condition, lifting route, voltage/frequency/phase, compressed air, ventilation and ambient temperatureDetermines installation, actuation choice, heating, service access and local compliance work

Line interfaces and workshop requirements

Upstream preparation

  • Confirm that cut pieces are identified and fit the drawing before they reach the press.
  • Remove abrasive, slurry, dust and free water; define who verifies that pieces are dry enough for the adhesive.
  • Specify the carrier, locating frame, face-down arrangement method and back-side glue application.
  • Keep adhesive open time compatible with the actual arrangement and transfer time.

Downstream handling

  • Provide a supported release and turning method; a large uncured assembly should not be lifted from one edge.
  • Define when the face is exposed for joint filling and when the piece may leave its support.
  • Separate pressing time from full adhesive cure time. Packing or installation before the specified cure can change geometry or bond performance.

Cleaning and adhesive control

  • Use the adhesive supplier’s cleaning method and personal-protection guidance.
  • Prevent cured adhesive, grit and chips from accumulating on the transparent reference surface or pin tips.
  • Agree which removable films, contact pads or release materials are compatible with the finished face and adhesive.
  • Provide ventilation where the adhesive or cleaner requires it; heating must not create an unassessed vapor or fire risk.

Floor space, access and services

  • Reserve space for the press, table travel or alternating tables, operator standing zones, sample staging, cleaning and maintenance access.
  • Check the floor for machine load, level and anchoring requirements; confirm door and lifting-route limits before shipment.
  • Bring the confirmed electrical supply to a lockable isolator. Provide compressed air only for a verified pneumatic configuration, or the specified hydraulic service arrangement for a hydraulic configuration.
  • Confirm ambient conditions and heat rejection if the project includes heating assistance.

Safety and operating boundary

The machine has crushing and pinch zones at the pressure head, moving table, transfer mechanism and locating frame. A heated configuration also adds hot-surface and adhesive-vapor considerations; a transparent glass reference surface adds impact and broken-glass hazards. The final project review must cover guards and interlocks, emergency stopping, stored hydraulic or pneumatic energy, electrical isolation, lifting points, safe cleaning, adhesive safety information and the buyer’s local rules. No safety certification or legal compliance is claimed on this page.

Acceptance starts with a representative sample

A practical pre-delivery test uses the buyer’s representative cut pieces, adhesive and intended support method. Before the test, both parties record the input condition, pressure-point arrangement, selected force window, any heating condition, press duration and the agreed geometry check. After pressing, the sample is turned and allowed to cure according to the adhesive instructions before the final agreed check.

This test verifies the proposed configuration against a defined sample; it does not create an unconditional guarantee for every material, pattern, thickness distribution, adhesive, cycle time or handling practice. Bond strength requires its own agreed test. Breakage remains influenced by material defects, cutting damage, thickness variation, local support and loading.

Related planning paths

Request a project-specific flattening press proposal

Define adhesive application and pressing as separate supply items

A waterjet-pattern assembly package may combine a glue-working surface and a flattening press. Specify who applies the adhesive, how each cut piece is identified and held, and which side touches the reference surface. A station supplied for pressing must not be assumed to include automatic adhesive mixing, dispensing or pattern placement.

Give the maximum assembly size, total thickness, adhesive type and working time, required support and the handling sequence before and after pressing. Where heating is proposed, obtain the adhesive supplier’s temperature and cure instructions and confirm the selected controls against them. Record the agreed pressure or displacement method and the inspection condition after curing. Pressing time, bond strength and final installed flatness remain project acceptance items, not promises inherited from an upstream machine description.

Conte-nos sobre o seu projeto

Seus dados serão utilizados exclusivamente para responder à sua consulta.