Pressure beam support blocks should be identified from their installed relationship to the pressure beam, contact surface and any guide or track—not from the words “track” or “no-track” alone. A replacement inquiry needs the existing block’s length, width, height, cross-section, hole spacing, contact face, direction, quantity and verified material evidence.
The BASAIR source presents track and no-track structural variants. Those labels confirm that variants exist; they do not establish a universal section, material, spring arrangement, hole pattern or machine compatibility. This page is for evidence collection and engineering review, not replacement approval.

Identify the installed position before selecting a variant label
Send a full-machine photograph with the pressure beam and the block position marked. Show the tile travel direction, operator side and drive side, and define left/right from a stated viewing direction. Photograph the block installed, the mating beam face, the machine-side support and any guide/track through its useful range.
If the plant calls the arrangement “track” or “no-track,” record that term but also show the physical interface. A rail, guide bar, channel, flat support or other mating form must be confirmed from the customer’s machine. Do not classify the item from the source rendering alone.

Measure cross-section, holes, contact faces and beam relationship
Use the removed item, an unworn mating feature or an approved drawing. Photograph all faces before cleaning or repair, then mark the datum face used for dimensions. Measure repeated blocks to check whether wear or deformation has changed the apparent size.
| Interface | What to measure or show | Não deduza |
|---|---|---|
| Block envelope and section | Overall length, width and height; section profile; steps, channels, shoulders, liners and clearances. | Section shape or size from a perspective rendering. |
| Hole and fastener pattern | Hole count, diameter/thread, depth if blind, center distances from datums, counterbores, fastener size and installed direction. | Thread, depth or fastener grade from appearance. |
| Contact and wear faces | Mark the pressure-beam face, machine/guide face and any sliding or replaceable contact surface; show wear depth or damage. | Friction property, hardness or service life without evidence. |
| Track or guide relationship | Rail/guide section, mating clearance, attachment, travel direction and installed photos at both ends. | That a source-labelled track form matches the existing guide. |
| Spring/guide hardware | Count, free/installed length if safely measurable, guide dimensions, fasteners and whether each item is requested or reused. | Spring rate, load or included quantity from the illustration. |
Confirm material evidence, direction and installed quantity
Provide a drawing, purchasing record or material certificate when material identity matters. If none is available, state that material is unverified and describe only observable features. Color, corrosion, magnet response or visual texture may be useful field notes, but they do not prove grade, heat treatment, hardness or coating.
Count the blocks across the entire beam and note whether they repeat identically, alternate direction or differ at the ends. Mark the installation direction on every variant. State the requested quantity and whether matching blocks on the opposite side or other beam positions are being retained. When possible, compare dimensions from one worn block and one less-worn block.
Separate the block from the support plate, rail and complete assembly
A larger structural plate that supports a mechanism belongs under machine support plates. A replacement rail or guide may need its own drawing and wear/interface evidence; it should not be assumed to be included with the block. If the buyer requires the complete pressure-beam arrangement rather than the block set, list every beam, guide, spring, fastener and mounting item and ask for a project-specific scope review.
If the correct mechanical family is uncertain, use tile line mechanical parts. For machine context, see the ceramic tile squaring and chamfering line; for the wider evidence route, see machine, tool and spare-part matching.
Prepare a pressure-beam support-block inquiry
- Machine manufacturer, model, serial number and nameplate photographs
- Exact pressure-beam position, tile-travel direction and defined left/right orientation
- Track/no-track label plus photographs proving the actual mating arrangement
- Overall length, width, height and complete cross-section dimensions
- Hole count, diameter/thread/depth, center distances, counterbores and fastener details
- Marked beam face, machine/guide face, sliding/contact face and wear areas
- Rail/guide section and clearance where applicable
- Spring, guide and fastener arrangement, with requested/reused status
- Material drawing/certificate or an explicit “material unverified” note
- Direction, total installed count, requested quantity and any end-position variants
- Fault description, overview/close photos and a short movement video if the beam or guide relationship is relevant
- País de destino e prazo solicitado
Send support-block measurements and installed-interface photos
Track/no-track naming and source renderings do not confirm dimensions, material, load, spring specification, included parts or machine fit. BASAIR confirms the final replacement only after reviewing the actual block, beam and guide interfaces.