Sintered-stone slab processing is a project-configured route that turns approved slab inputs and finished-part drawings into supported cutting, edge preparation, handling and shipping steps. It is not one fixed line. The real buying decision is which geometry belongs to a bridge saw, a repeat straight-cut station, a vertical or angled waterjet, or a dedicated 45-degree machine—and how fragile parts remain supported between those operations and final packaging.
BASAIR can coordinate that route with selected equipment sources, but each machine, interface and acceptance value must be confirmed against the buyer’s material, dimensions, drawings, product mix, site and utilities. Start from the Soluções overview when comparing this route with other factory problems.

Choose the route from the finished part
Send dimensioned drawings for representative finished parts and mark the visible face, reference edge, straight cuts, repeated strip widths, internal cutouts, bevels, retained miter sections, holes, profiles and edges that will be finished later. This separates flexible geometry from repeat production and prevents two machines from being specified for the same duty.
| Decisão do comprador | Caminho a ser avaliado | Evidence needed before configuration | Main trade-off |
|---|---|---|---|
| Mixed straight, angled and shaped slab cuts | CNC bridge saw | Part drawings, blade access, slab support, table functions and software workflow | Flexible programmed geometry versus a more specialized repeat process |
| Repeated straight subdivision into strips or blanks | Double- or multi-blade slab cutting | Cut schedule, datum edge, blade/kerf plan, narrowest output and infeed/outfeed support | Repeat straight production versus variable angles and profiles |
| Vertical contours or internal two-dimensional cutouts | Three-axis waterjet | DXF/drawing, material and thickness, smallest feature, vertical edge requirement and pump/system brief | Simpler vertical-head route versus programmed angled cutting |
| Angled cut, taper-control task or bevel geometry | Five-axis waterjet | Required angle, top/bottom geometry, head kinematics, clearance simulation and programmed-part trial | Extra angular access and programming complexity must solve a real part requirement |
| Long decorative 45-degree joint with a retained end | Dedicated sintered-stone mitering | Retained length, slab thickness, edge length, visible face, support and downstream bonding/finishing plan | Dedicated edge control versus assigning the work to a general cutting machine |

Connect cutting operations without losing the slab datum
The route should identify the datum retained after every cut, the support points for the complete slab and separated pieces, and the point at which each part is inspected. A cut blank should not enter an irreversible mitering, bonding or packaging step until its dimensions, edge condition and visible face have been checked by the agreed method.
A dual-head or sink-oriented waterjet is a conditional branch when parallel head use or a sink-specific fixture and visual workflow is genuinely required. It is not the default waterjet for every slab. The quotation must state whether the heads work together or independently, which areas they can reach, and how fixtures, workpiece movement and collision risks are controlled.


Freeze handling and packaging as part of the process
For each handoff, record slab or part dimensions, mass, stiffness, center of gravity, surface finish, edge sensitivity and permitted contact zones. Confirm whether the piece travels flat or vertical, whether suction can be trialled on the real face, how a broken or failed pickup is recovered, and where operators can inspect and remove rejects.
The current large-slab packaging route begins with the required logistics unit: supported pack, pallet, trestle, crate or another approved method. Film, separators, corner protection, straps, lift points and forklift/crane handoff must follow the actual product and transport route. The packaging module does not retroactively solve unsupported movement between cutting machines.


Utilities and interfaces to release before layout approval
| Interface | Data to freeze | Release / acceptance check |
|---|---|---|
| Mechanical handoff | Direction, height, datum, support spacing, transfer gap, maximum overhang, part orientation and reject route | Representative minimum/maximum parts pass between stations without uncontrolled sag, impact, marking or loss of datum |
| Waterjet package | Conditioned water, selected pump/intensifier, high-pressure line, abrasive supply, cooling, catcher, drainage and maintenance access | O high-pressure, abrasive and cooling system is released as one pressure and utility boundary for the selected duty |
| Wet cutting and slurry | Clean-water condition, delivery points, drains, sumps, solids separation, reuse/discharge responsibility and slip control | Run the agreed duty without uncontrolled overflow, blocked cleanup access or recirculated solids outside the confirmed equipment limits |
| Electrical, air and controls | Voltage, frequency, phases, available load, earthing, compressed air/vacuum, line master, ready/busy/fault signals and recipe ownership | Witness normal handoff, blocked downstream, failed pickup, power loss, controlled stop and safe restart |
| Floor, access and lifting | Machine and full operating loads, anchors, pits, clear height, service withdrawal, crane/forklift routes and consumable change space | Final arrangement and load drawings are checked by the site before delivery release |
Safety and maintainability are line responsibilities
Define fixed and interlocked guards, bridge/head and robot envelopes, blade and jet exclusion zones, emergency-stop zoning, lockout points, retained-load response, lifting plans, wet-floor controls and safe methods for clearing offcuts or broken slabs. Waterjet maintenance requires the selected machine and pump procedure, isolation of all applicable energy, the specified bleed-down sequence and verified zero pressure. An emergency stop is not an energy-isolation method.
Future high-pressure wear items must be tied to the exact machine, pump, head, part number and interfaces. Use the waterjet consumable-parts identification route for recurring nozzles, mixing tubes, jewels, seals or pressure-side assemblies; appearance alone does not prove compatibility.
Build acceptance around representative samples
Before ordering, agree which buyer-supplied slabs and drawings expose the route’s limits: the largest slab, thinnest or most flexible part, narrowest strip, smallest retained section, longest miter, most demanding internal cutout, heaviest handling case and the actual shipping package. Record material lot, tool or consumable identity, program revision, supports, settings and operator interventions.
Inspection can include part dimensions, angles, top/bottom geometry, edge chipping, visible-face marking, miter fit, retained length, cutout fit, surface condition after handling, package stability and fault recovery. The method, sampling and allowable values are project acceptance criteria; no fixed accuracy, cycle, tool life, breakage result or packaging outcome is promised here.
Send one complete project brief
- Slab materials, body construction, finish, minimum/maximum length, width, thickness, mass, flatness and fragile-edge conditions.
- Dimensioned drawings and editable files for representative parts, with datum faces, cut types, miters, holes, profiles and later finishing marked.
- Product mix, required usable output, shifts, changeover frequency, batch sizes and the intended division of work between machines.
- Current or planned infeed/outfeed, working heights, orientations, support points, inspection positions, reject route and packaging unit drawing.
- Available floor plan, clear height, floor loading, lifting route, power, water quality, drainage, cooling, compressed air/vacuum and slurry-handling boundary.
- Waterjet pump/head/software preferences, abrasive handling, future spare-parts policy and any existing equipment that must be retained.
- Applicable site safety requirements, responsible engineering parties, required documents and the proposed sample and acceptance method.
- Project location, planned timing and photos/video of the current material flow where an existing line is being extended.
Submit slab drawings, samples and site data for a route review
Final machine selection, working envelope, utilities, safety design, performance and acceptance depend on the actual material, product drawings, selected configuration, project site and engineering confirmation.